Laserfiche WebLink
Ordinance No. NS-XXX <br />Page 31 of 73 <br /> <br /> <br />v. A signed statement that the proposed location of the commercial cannabis <br />business on the application meets the zoning criteria established in this article <br />including, but not limited to, any and all sensitive use separation criteria <br />required by this article. <br />vi. Proof of site control for commercial cannabis retail businesses submitting <br />Phase 1 applications on or after July 1, 2018. <br />d. The Director of Planning and Building or his or her designee(s) shall determine <br />whether each application demonstrates compliance with the minimum <br />requirements (above) and be placed on the RSP Eligibility List and entered into <br />the Phase 2 application and review process. <br />(e) (d) The Director of Planning and Building or his or her designee(s) shall review <br />each application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be notified <br />in writing of the deficiencies. The applicant shall be given an opportunity to cure <br />any incomplete or deficient application prior to the conclusion of the application <br />processing term, if such time period is applicable. <br />3. Phase 2 — Regulatory Safety Permit Application. <br />(a) Each complete and compliant applicant identified on the RSP Eligibility List may <br />choose to complete and file a RSP application to the Director of Planning and <br />Building. The application shall be filed together with a nonrefundable fee as <br />established by resolution of the City Council, to defray the cost of investigation <br />required by this article. <br />(b) The RSP application period shall be open for thirty (30) calendar days and may <br />run concurrently with the Phase 1 review period. Following the RSP application <br />period, the Director of Planning and Building or designee(s) shall stop accepting <br />applications and review all applications received in Phase 2. <br />(c) The Director of Planning and Building or designee(s) will review all application <br />documents required in the City's Phase 2 application package plus the additional <br />requirements in subsection (d) below. The Director of Planning and Building or his <br />or her designee(s) will use a merit based point system to review and rank each of <br />applications from the most to the least points and objectively award the top <br />applicants a RSP. A complete description of the merit based point system and all <br />merit based point considerations shall be included with the application forms. <br />(d) Phase 2 requirements include, but are not limited to: <br />i. All application documents required in the City's Phase 2 RSP application <br />package. <br />Exhibit 1