My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Lincoln Avenue Water and Sewer Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 16 - Lincoln Avenue Water and Sewer Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 10:22:31 AM
Creation date
8/16/2023 8:52:45 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO. 1 <br />PROPOSAL <br />PROJECT NO.: 22-6468 & 22-6620 <br />LINCOLN AVENUE WATER AND SEWER IMPROVEMENTS <br />BID PROPOSAL <br />l(Yi�9ll.� Iili�►[iff�i��l�. 090WK0J�"lm"rAUI <br />1"RON1: 4] 1 a <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or hump sure(s) set forth in the <br />following schcdule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit .Price <br />Amount <br />I <br />Mobilization (max. 5% of total bid) <br />l <br />LS <br />$ <br />7Dfoo-o <br />70 000 <br />2 <br />8" Class 305 (DR 14) C900 PVC <br />Pipe <br />920 <br />LF <br />$ <br />$ 9 <br />0 j �j <br />f <br />3 <br />l" Copper Water Service <br />9 <br />EA <br />$-; f <br />I <br />4 <br />4" Fire Sen+ice <br />1 <br />EA <br />$ r <br />$ <br />5 <br />8" Resilient Wedge Gate Valve <br />4 <br />EA <br />S of o o <br />O <br />6 <br />Firc Hydrant <br />4 <br />EA <br />S r r J 0� 0 <br />$� 1 a) <br />7 <br />Vertical Offset (As -Needed)* <br />3 <br />EA <br />S a <br />$';� 00 J <br />8 <br />1" Air and Vacuum release Valve <br />(As -Needed)* <br />I <br />EA <br />S <br />71 7 O Q <br />$ r <br />7 7 <br />9 <br />Additional Potholing (As -Needed)* <br />I <br />EA <br />$ 750 <br />S 7 �_p O <br />10 <br />6" SDR-26 PVC Pipe <br />20 <br />LF <br />S CJ <br />1 1 <br />8" SDR-26 PVC Pipe <br />820 <br />Ll= <br />$ r <br />37 `7 <br />S <br />3o7, �_oD <br />12 <br />Scwer Lateral and Cleanout (Omen <br />Trench) <br />10 <br />EA <br />S 6r O DQ <br />160 I 0-0-0 <br />13 <br />Remove Existing Manhole Structure <br />4 <br />EA <br />$ d Do <br />116, 000 <br />14 <br />New Manhole Structure <br />5 <br />EA- <br />S ar a 3-3 <br />S / (9 a o-D <br />P-1 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.