Laserfiche WebLink
PROJECT TITLE: <br />MacArthur Boulevard Resurfacing: Flower to <br />Main <br />PROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />u .. MMV•iN <br />W Warner Ave <br />ve �+ <br />E Wa Are <br />E W.m , Aw <br />w <br />9 <br />h <br />N <br />rry�k Ave <br />N <br />W pyv Rd F Dyer Rd <br />yl <br />�*c EA.`ran RvR <br />,rr � <br />W MacArthur sib <br />7.� <br />a <br />W Sunflower Ave SunRp Ara <br />fr� <br />« Sourh <br />u+ SWTH COAST WTRO <br />�Va:a � R <br />Cn <br />' er.s*v%.�- <br />IIr <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacementlinstallation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of MacArthur Boulevard pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction 77019,000 <br />Engineering $81,000 <br />TOTAL $1,100,000 <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />RMRA SB1 $1,100,000 <br />TOTAL $1,100,000 <br />AGENCY DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Kenny Nguyen, Senior Civil Engineer 24-May-2019 <br />-13- <br />