My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Construction Contract Award for MacArthur Boulevard Resurfacing
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 17 - Construction Contract Award for MacArthur Boulevard Resurfacing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 10:22:46 AM
Creation date
8/16/2023 8:52:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />MacArthur Boulevard Resurfacing: Flower to <br />Main <br />PROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />u .. MMV•iN <br />W Warner Ave <br />ve �+ <br />E Wa Are <br />E W.m , Aw <br />w <br />9 <br />h <br />N <br />rry�k Ave <br />N <br />W pyv Rd F Dyer Rd <br />yl <br />�*c EA.`ran RvR <br />,rr � <br />W MacArthur sib <br />7.� <br />a <br />W Sunflower Ave SunRp Ara <br />fr� <br />« Sourh <br />u+ SWTH COAST WTRO <br />�Va:a � R <br />Cn <br />' er.s*v%.�- <br />IIr <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacementlinstallation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of MacArthur Boulevard pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction 77019,000 <br />Engineering $81,000 <br />TOTAL $1,100,000 <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />RMRA SB1 $1,100,000 <br />TOTAL $1,100,000 <br />AGENCY DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Kenny Nguyen, Senior Civil Engineer 24-May-2019 <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.