My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Local Street Sidewalk Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 18 - Local Street Sidewalk Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 10:23:02 AM
Creation date
8/16/2023 8:53:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Local Street Sidewalk Improvements <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Project involves replacement of existing damaged concrete <br />sidewalks in residential neighborhoods and will include the removal <br />and replacement of adjacent damaged concrete curbs, gutter and <br />driveways. Project will focus on areas with the highest concentration <br />of needed repairs, to help mitigate trip and fall hazards and reducing <br />potential of liability claims and assist in complying with regulations <br />set forth by the American with Disabilities Act. <br />PROJECT NEED: <br />Staff evaluates the condition of damaged sidewalks, curbs, gutters and <br />driveways to identify uneven surfaces and cracks that may pose a risk <br />to pedestrians. The goal is to improve safe walking accessibility for <br />pedestrians and increase active modes of transportation, such as <br />walking and biking. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 373,064 - - - - - - <br />TOTAL 373,064 - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />CDBG Programs 373,064 - - - - - - <br />TOTAL 373,064 - - - - <br />DIVISION: <br />C/P Engineering <br />CONTACT: <br />Gilbert Castillo, Senior Engineer <br />DATE: <br />22-Mar-2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.