My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Time Extension of Measure M2 CTFP Construction Grant Funds
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 19 - Time Extension of Measure M2 CTFP Construction Grant Funds
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 8:53:20 AM
Creation date
8/16/2023 8:53:19 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/pw <br />Item # 19 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />April 19, 2022 <br />TOPIC: Time Extension of Measure M2 CTFP Construction Grant Funds <br />AGENDA TITLE <br />Approve Submittal of Request for Time Extension of the Measure M2 Comprehensive <br />Transportation Funding Program for Warner Avenue Improvements Phase 2 and Bristol <br />Street and Memory Lane Projects (Project No. 14-6802 and 17-6883) (Non-General <br />Fund) <br />RECOMMENDED ACTION <br />Authorize the Public Works Agency to request a two-year time extension of Measure M2 <br />Comprehensive Transportation Funding Program construction funds for the Warner <br />Avenue Improvements, Phase 2, from Oak Street to Grand Street project (21-SNTA-ACE- <br />3997) and for Bristol Street and Memory Lane Intersection Improvements (21-SNTA-ICE- <br />3995). <br />DISCUSSION <br />The Warner Avenue Improvements, Phase 2, from Oak Street to Grand Street project <br />and the Bristol Street and Memory Lane Intersection Improvements project were awarded <br />$10,088,805 in construction funding by the Orange County Transportation Authority <br />(OCTA) Measure M2 Comprehensive Transportation Funding Program (CTFP) for Fiscal <br />Year 2021-22. <br />The Warner Avenue improvements from Oak Street to Grand Street include adding <br />sidewalks and bike lanes, undergrounding utilities, and widening the roadway from the <br />existing four lanes to six lanes. In addition to the on-street, dedicated Class II bike lanes <br />and ADA-compliant sidewalks, the project includes a raised landscape median and <br />landscaped parkway buffer, both with drought-tolerant plants. <br />Bristol Street and Memory Lane Intersection Widening Improvements involve the <br />widening of Bristol Street immediately north of Memory Lane to accommodate an <br />additional through southbound lane. Additionally, the proposed improvements would <br />include the construction of a sidewalk, curb and gutter, pavement, signal modification, <br />and curb ramps.
The URL can be used to link to this page
Your browser does not support the video tag.