My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 10:05:36 AM
Creation date
8/16/2023 10:03:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana General Plan Update <br />CEQA Findings of Fact and Statement <br />Of Overriding Considerations -27- October 2021 <br />The Industrial and Industrial Flex land uses are not anticipated to produce odors, and Mitigation <br />Measure AQ-4 would ensure that odor impacts are minimized and facilities would comply with <br />South Coast AQMD Rule 402. Therefore, Impact 5.2-6 would be less than significant. <br />Mitigation Measures <br />AQ-4 Prior to discretionary approval by the City of Santa Ana, if it is determined that a <br />development project has the potential to emit nuisance odors beyond the property line, <br />an odor management plan shall be prepared by the project applicant and submitted to <br />the City of Santa Ana for review and approval. Facilities that have the potential to <br />generate nuisance odors include, but are not limited to: <br />• Wastewater treatment plants <br />• Composting, green waste, or recycling facilities <br />• Fiberglass manufacturing facilities <br />• Painting/coating operations <br />• Large-capacity coffee roasters <br />• Food-processing facilities <br />The odor management plan shall demonstrate compliance with the South Coast Air <br />Quality Management District’s Rule 402 for nuisance odors. The Odor Management <br />Plan shall identify the best available control technologies for toxics (T-BACTs) that will <br />be utilized to reduce potential odors to acceptable levels, including appropriate <br />enforcement mechanisms. T-BACTs may include but are not limited to scrubbers (i.e., <br />air pollution control devices) at the industrial facility. T-BACTs identified in the odor <br />management plan shall be identified as mitigation measures in the environmental <br />document prepared for the development project and/or incorporated into the project’s <br />site plan. <br />Finding <br />Finding 1. The City hereby makes Finding 1. Changes or alterations have been required in, or <br />incorporated into, the project that avoid or substantially lessen the significant environmental effect <br />as identified in the PEIR. These changes are identified in the form of the mitigation measure <br />above. The City of Santa Ana hereby finds that implementation of the mitigation measure is <br />feasible, and the measure is therefore adopted. <br />2. Biological Resources <br />Impact 5.3-1: Implementation of the General Plan Update could result in adverse impacts <br />to candidate, sensitive, or special-status species. <br />The inventory of existing conditions determined that no parcels with a proposed land use <br />designation that allows for development (i.e., not an open space designation) currently has
The URL can be used to link to this page
Your browser does not support the video tag.