My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 10:05:36 AM
Creation date
8/16/2023 10:03:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana General Plan Update <br />CEQA Findings of Fact and Statement <br />Of Overriding Considerations -68- October 2021 <br />X. RESOLUTION REGARDING CONTENTS AND CUSTODIAN OF RECORDS <br />The documents and materials that constitute the record of proceedings on which these findings <br />have been based are located at the City of Santa Ana Planning Division Counter. The custodian <br />for these records is the City of Santa Ana. This information is provided in compliance with Public <br />Resources Code section 21081.6. <br />The record of proceedings for the City’s decision on the project consists of the following <br />documents, at a minimum: <br />1. The NOP and all other public notices issued by the City in conjunction with the project. <br />2. The Draft PEIR for the Santa Ana General Plan Update. <br />3. All comments submitted by agencies or members of the public during the 45-day comment <br />period on the Draft PEIR and the 20-day extension to the comment period. <br />4. The Final PEIR for the Santa Ana General Plan Update, including comments received on the <br />Draft PEIR, responses to those comments, and technical appendices. <br />5. The Recirculated Draft PEIR for the Santa Ana General Plan Update. <br />6. All comments submitted by agencies or members of the public during the 45-day comment <br />period on the Recirculated Draft PEIR. <br />7. The Final Recirculated PEIR for the Santa Ana General Plan Update, including comments <br />received on the Recirculated Draft PEIR, responses to those comments, and technical <br />appendices. <br />8. The Mitigation Monitoring and Reporting Plan for the project. <br />9. All findings, resolutions, and ordinances adopted by the City in connection with the General <br />Plan Update, and all documents cited or referred to therein. <br />10. All reports, studies, memoranda, maps, staff reports, or other planning documents relating to <br />the project prepared by the City, consultants to the City, or responsible or trustee agencies <br />with respect to the City’s compliance with the requirements of CEQA and with respect to the <br />City’s action on the Santa Ana General Plan Update. <br />11. All documents submitted to the City by other public agencies or members of the public in <br />connection with the General Plan Update PEIR up through project approval. Matters of <br />common knowledge to the City, including, but not limited to federal, state, and local laws and <br />regulations. <br />12. Any documents expressly cited or referenced in these findings, in addition to those cited <br />above.
The URL can be used to link to this page
Your browser does not support the video tag.