My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 10:05:36 AM
Creation date
8/16/2023 10:03:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Page 18 PlaceWorks <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Mitigation Measure Timing <br />Responsible Implementing Party Responsible Monitoring Party <br />Document Location (Monitoring Record) <br />Completion Date <br />Responsible Monitoring Party Project Mitigation Monitor <br />• GHG inventories of existing and forecast year GHG levels. <br />• Tools and strategies for reducing GHG emissions to ensure a <br />trajectory with the long-term GHG reduction goal of Executive <br />Order S-03-05. <br />• Plan implementation guidance that includes, at minimum, the <br />following components consistent with the proposed CAP: <br /> Administration and Staffing <br /> Finance and Budgeting <br /> Timelines for Measure Implementation <br /> Community Outreach and Education <br /> Monitoring, Reporting, and Adaptive Management <br /> Tracking Tools <br />Furthermore, the following measures will be considered when the City <br />updates the Climate Action Plan: <br />• Measures to protect the most vulnerable populations <br />• Measure to increase carbon sinks <br />• Standards for electric vehicle parking <br />• Standards for construction projects <br />5.12 NOISE <br />N-1 Construction contractors shall implement the following measures for <br />construction activities conducted in the City of Santa Ana. Construction <br />plans submitted to the City shall identify these measures on demolition, <br />grading, and construction plans submitted to the City: The City of Santa <br />Ana Planning and Building Agency shall verify that grading, demolition, <br />and/or construction plans submitted to the City include these notations <br />prior to issuance of demolition, grading, and/or building permits. <br />• Construction activity is limited to the hours: Between 7 AM to 8 <br />PM Monday through Saturday, as prescribed in Municipal Code <br />Section 18-314(e). Construction is prohibited on Sundays. <br />• During the entire active construction period, equipment and trucks <br />used for project construction shall use the best-available noise <br />control techniques (e.g., improved mufflers, equipment re-design, <br />Prior to issuance <br />of demolition, <br />grading, and/or <br />building permits <br />Project <br />Applicant/ <br />Developer and <br />Architect <br />City of Santa <br />Ana Building <br />Safety Division <br />City of Santa <br />Ana Building <br />Safety <br />Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.