My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Item 30 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 10:05:36 AM
Creation date
8/16/2023 10:03:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana General Plan Update <br />CEQA Findings of Fact and Statement <br />Of Overriding Considerations -10- October 2021 <br /> Santa Ana Boulevard between French Street and Santiago Street (currently Primary <br />Arterial) <br /> Santa Ana Boulevard between Raitt Street and Flower Street (currently Major Arterial) <br /> Cambridge Street between Fairhaven Avenue and SR-22 freeway (currently Local <br />Arterial) <br /> Hazard Avenue between Euclid Street and Harbor Boulevard (currently Secondary <br />Arterial) <br /> Halladay Avenue between Warner Avenue and Dyer Road (currently Secondary Arterial) <br /> McFadden Avenue between Harbor Boulevard and Grand Avenue (currently Secondary <br />Arterial) <br /> Broadway between 1st Street and 17th Street (currently Secondary Arterial) <br /> 4th Street between French Street and Grand Avenue (currently Primary/Secondary <br />Arterial) <br /> Fairhaven Avenue from Grand Avenue to Tustin Avenue (currently Secondary Arterial) <br /> Reclassified as Primary Arterial: <br /> Santa Ana Boulevard between Flower Street and Ross Street (currently a Major Arterial) <br /> 1st Street between Bristol Street and Tustin Avenue (currently Major Arterial) <br /> Reclassify as Collector Arterial: <br /> Civic Center Drive between French Street and Santiago Street (currently a Secondary <br />Arterial) <br /> Add the following to the MPSH as Divided Collector Arterial: <br /> Greenville Street between Segerstrom Avenue and Warner Avenue <br /> Add the following to the MPSH as Collector Streets: <br /> Civic Center Drive between Spurgeon Street and Santiago Street (currently Local Street) <br /> Broadway from Anahurt Street to Main Street (currently Local Road) <br /> Remove the following from the MPSH <br /> Memory Lane from the City Center Drive to SR-22 <br /> Wright Street from 14th Street to Fruit Street <br /> 4th Street from French Street to Ross Street <br /> Washington Avenue from Broadway to Main Street <br /> 10th street from Broadway to Main Street <br /> Columbine Avenue from Main Street to 55 FWY <br /> Halladay street from Dyer Road to Alton pkwy
The URL can be used to link to this page
Your browser does not support the video tag.