My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Item 14 - Stormwater Channel Fencing Upgrades Phase II Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 9:33:02 AM
Creation date
8/16/2023 10:31:49 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
4/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM NO. 2 <br />CITY OF SANTA ANA PROJECT NO.22-1390 <br />PROPOSAL <br />PROJECT NO.: 22-1390 <br />STORMWATER CHANNEL FENCING UPGRADES PHASE II <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: L10-1*M-A:LWr.-,- �_ `.0 I t� L <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Remove and Dispose existing chain link <br />3,960 <br />LF <br />$ <br />$ <br />fence, posts and foundations, complete. <br />`1 <br />- qo <br />2 <br />Furnish and Install, complete, 8-Foot High <br />3,960 <br />LF <br />$ <br />$ <br />Securifor 4D fence and concrete foundation <br />per plan. <br />13r? <br />512 j 2-0 <br />3 <br />Furnish and Install Complete 8-Foot High by <br />10 <br />EA <br />$ <br />$ <br />6-Foot Wide Securifor 4D single swing gate <br />per plan. <br />_ <br />$ QO0 <br />$u 000 <br />4 <br />Furnish and Install sign on fence (CSA). <br />13 <br />EA <br />$ <br />$ <br />�D ^ <br />900 r <br />5 <br />Traffic Signs. <br />24 <br />EA <br />$ 2�0 - <br />$ r <br />6,600 <br />6 <br />Pedestrian Barricade. <br />2 <br />EA <br />_ _ <br />7 <br />Vandalism - Maintenance Period (90 <br />1 <br />LS <br />$15,000 <br />$ <br />Calendar Days). <br />t500(�� <br />8 <br />Mobilization <br />1 <br />LS <br />$ <br />$ <br />9 <br />Construction Permit <br />I <br />LS <br />$9,288 <br />$9,288 <br />10 <br />Project Sign <br />1 <br />LS <br />$ <br />ow <br />P-1 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.