My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Cabrillo Park Irrigation Renovation Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Item 15 - Cabrillo Park Irrigation Renovation Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 9:27:58 AM
Creation date
8/16/2023 10:32:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
4/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 6 <br />1 <br />PROJECT TITLE: <br />Cabrillo Irrigation Renovation <br />PROJECT CATEGORY: <br />Park Facility Improvements <br />Park Facility <br />LOCATION MAP <br />n <br />Ny6t ' ' -- - <br />FF <br />13R�W f,rlllo <br />sT � nm <br />z w ant r r <br />CIFt w {x: <br />L <br />6TH ST X <br />PARI4CDlJRT PL nth Ctf3�, � <br />uu <br />o <br />] 4TH ST <br />CITY OF SANTA ANA FY 21/22 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION <br />Design and installation of a new State of the Art <br />Automatic irrigation system throughout the <br />Cabrillo Park site. <br />PROJECT NEED: <br />The existing irrigation system is an old hydraulic <br />system with a transit main line pipe. The system <br />continually breaks down and is unreliable. <br />Through the years, many of the irrigation heads <br />have been replaced with the wrong nozzles that <br />have compromised the efficiency of the watering <br />in he park and creates many dry brown spots. <br />JIM <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction $$ 319143 <br />TOTAL $ 319,143 <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />A&DDistrict 2 <br />TOTAL $ 319,143 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Jason Gabriel, Principal Civil Engineer 5 Apr-2022 <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.