Laserfiche WebLink
EXHIBIT 6 <br />1 <br />PROJECT TITLE: <br />Cabrillo Irrigation Renovation <br />PROJECT CATEGORY: <br />Park Facility Improvements <br />Park Facility <br />LOCATION MAP <br />n <br />Ny6t ' ' -- - <br />FF <br />13R�W f,rlllo <br />sT � nm <br />z w ant r r <br />CIFt w {x: <br />L <br />6TH ST X <br />PARI4CDlJRT PL nth Ctf3�, � <br />uu <br />o <br />] 4TH ST <br />CITY OF SANTA ANA FY 21/22 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION <br />Design and installation of a new State of the Art <br />Automatic irrigation system throughout the <br />Cabrillo Park site. <br />PROJECT NEED: <br />The existing irrigation system is an old hydraulic <br />system with a transit main line pipe. The system <br />continually breaks down and is unreliable. <br />Through the years, many of the irrigation heads <br />have been replaced with the wrong nozzles that <br />have compromised the efficiency of the watering <br />in he park and creates many dry brown spots. <br />JIM <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction $$ 319143 <br />TOTAL $ 319,143 <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />A&DDistrict 2 <br />TOTAL $ 319,143 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Jason Gabriel, Principal Civil Engineer 5 Apr-2022 <br />- 1 - <br />