Laserfiche WebLink
EXHIBIT 4 <br />Construction Contract 3,024,538.00$ <br />Contract Administration, Inspection and Testing 453,681.00$ <br />Contingencies 421,781.00$ <br />Water Engineering 150,000.00$ <br />TOTAL ESTIMATED CONSTRUCTION COSTS 4,050,000.00$ <br />CONSTRUCTION OF PROJECT NOS. 21-6452, 21-6456: INDUSTRIAL STREETS <br />(PHASE 1) WATER & SEWER IMPROVEMENTS <br />COST ANALYSIS