My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Residential Street Repair Program
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Item 17 - Residential Street Repair Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 10:32:51 AM
Creation date
8/16/2023 10:32:47 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
4/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project entails the rehabilitation of existing roadway pavement <br />for local streets. The project will include the removal and <br />replacement of existing concrete streets. Various replacement <br />pavement strategies will be investigated to determine the most cost <br />effective and maintainable treatment. Minor concrete repair to <br />severely damaged or missing curbs, gutters, sidewalks, and <br />wheelchair ramps will also be included. Work in FY 22-23 will focus <br />on the Heninger Park Neighborhood. <br />PROJECT NEED: <br />The local street network has 316 miles citywide. In 2007 the City <br />embarked on an extensive citywide improvement plan to rehabilitate <br />and slurry seal the majority of the network. By the end of 2015, the City <br />has completed rehabilitating all asphalt residential streets and currently <br />working toward improving all residential concrete streets. <br />PROJECT TITLE: <br />Residential Street Repair Program <br />PROJECT CATEGORY: <br />Street Improvements <br />Neighborhood Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Gilbert Castillo, Senior Engineer 15-Mar-2022 <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 1,025,925 ------ <br />TOTAL 1,025,925 ------ <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />CDBG Programs 1,025,925 ------ <br />TOTAL 1,025,925 ------
The URL can be used to link to this page
Your browser does not support the video tag.