My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Amend Design Services Agreement for Santiago Park Main Street Entrance
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
03/15/2022 Regular
>
Item 17 - Amend Design Services Agreement for Santiago Park Main Street Entrance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2024 3:02:04 PM
Creation date
8/16/2023 11:04:01 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
3/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
items listed in the RFP on page A1-3 and be ready for <br />building permit submittal with all required supporting <br />calculations and documentation. <br />3.E — 3N Cost Estimate <br />No Change — added cost estimating covered above <br />3.F — 3.0 Specifications <br />No Change — added specifications covered above <br />3.G1— 3.P Permitting <br />Due to the construction within the creek and related <br />floodplain, the project will require the following permits: <br />• Corps under Section 404 (discharge of fill into waters) <br />• Regional Water Quality Control Board under Section <br />401 <br />• Section 1601 Streambed Alteration agreement from <br />the California Fish and Wildlife agency <br />The final set of bid documents will incorporate all the City <br />review comments, conditions from the approved 401, 404 <br />and 1601 permits and building permit inputs and go through <br />a final QA/QC check before submittal for City approval and <br />obtaining the building permit for the grading and structures. <br />TASK 4 - RIDDING SUPPORT, CONSTRUCTION <br />ADMINISTRATION AND RECORD DRAWINGS <br />The H&A Team looks forward to supporting City staff in the <br />bidding and construction process since we agree the design <br />team can be very valuable during this critical stage in <br />protecting the City from problems. H&A has anticipated both <br />pre -bid and pre -construction meetings to be attended and <br />is ready to provide rapid responses to any issues that arise <br />from City staff. The H&A Team will also be proactive in <br />warning the City and contractor of potential problems based <br />on our intimate knowledge of the bid documents. <br />SCHEDULE <br />Our revised schedule on the next page is based on the <br />original plus the change order scope of services above. We <br />are assuming approval for the change order and final <br />concept drawing in mid -February (2 months from now) and <br />have adjusted the 50% and 90% review periods to 4 weeks <br />RFP No. 20-154 <br />Santiago Park Main Street Entrance Design <br />B <br />Develop 90% design plans <br />H&A Team <br />- Structural <br />C <br />Develop 90% design plans <br />H&A Team <br />-Landscape <br />n <br />tt <br />o design plans <br />4'IQ,�vc�-" ,Tntia',n <br />E <br />Update GOst estimate to <br />90% level <br />H&A Te <br />Prepare draft teGhnlnal <br />G <br />QC Review <br />H&A ,Tea',� <br />G1 <br />Submit draft permits — 401, <br />H&A Team <br />404 and 1601 for review <br />CITY REVIEW (90% <br />H <br />submittal) including <br />CITY <br />building permit process <br />90% City review prepare <br />I <br />agenda held meeting <br />prepare mini itec revise <br />CITY and H&A <br />Tea <br />Develop 100% design <br />H&A Team <br />plans - Civil Engineering <br />K <br />Develop 100% design <br />H&A Team <br />plans - Structural <br />Develop 100% design <br />L <br />plans - Landscape <br />H&A Team <br />M <br />Develop 100% design <br />H&A Team <br />plans - Electrical <br />N <br />Prepare final cost estimate <br />H&A Team <br />0 <br />Prepare final technical <br />H&A Team <br />specifications <br />P <br />Obtain approvals for 401, <br />H&A Team <br />404 and 1601 permits <br />Q <br />QC Review <br />H&A Team <br />3 <br />CITY APPROVAL (Final <br />R <br />PS&E) including building <br />CITY <br />permit <br />HUNSAKER&ASSOCIATES IRVINE, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.