Laserfiche WebLink
Jurisdiction Santa Ana <br />Reporting Period 2021 (Jan. 1 - Dec. 31) <br />Planning Period 5th Cycle 10/15/2013 - 10/15/2021 ANNUAL ELEMENT PROGRESS REPORT <br />Housing Element Implementation <br />2 3 4 <br />APN Street Address Project Name+Local Jurisdiction <br />Tracking ID+ <br />Realistic Capacity <br />Identified in the <br />Housing Element <br />Entity to whom the site <br />transferred Intended Use for Site <br />1 <br />Summary Row: Start Data Entry Below <br />Note: "+" indicates an optional field <br />Cells in grey contain auto-calculation <br />formulas <br />(CCR Title 25 §6202) <br />Table G <br />Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of <br />Project Identifier <br />NOTE: This table must only be filled out if the housing element <br />sites inventory contains a site which is or was owned by the <br />reporting jurisdiction, and has been sold, leased, or otherwise <br />disposed of during the reporting year.