Laserfiche WebLink
EXHIBIT 3 <br />Construction Contract 307,613.00$ <br />Contract Administration, Inspection and Testing 46,079.00$ <br />Contingencies 31,308.00$ <br />TOTAL ESTIMATED CONSTRUCTION COSTS 385,000.00$ <br />CONSTRUCTION OF PROJECT NO. 22-7534: Main Street at Walnut Street New <br />Traffic Signal Installation (Hybrid Beacon) & Crosswalk Upgrade (RRFB) <br />COST ANALYSIS