My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Santa Ana Stadium Synthetic Turf Replacement Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 13 - Santa Ana Stadium Synthetic Turf Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:29:45 PM
Creation date
8/16/2023 11:41:46 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
2/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FoleldTurf <br />A Tarkett Sports Company <br />The Supplier shall perform the work required by this Agreement as diligently and expeditiously as is <br />consistent with the highest professional standards and the orderly progress of the work and in a <br />good and workmanlike fashion, and subject to and in accordance with the terms and conditions <br />hereof. The Supplier requires a minimum of 12 weeks lead time from the acceptance of layouts and <br />approval of all plans prior to any work commencing at the Site. <br />SITE PREPARATION WORK <br />Notwithstanding, any work regarding the existing drainage base of the field other than ensuring its <br />planarity ready for the new surfacing is specifically excluded from the Supplier's scope of work and <br />the Sourcewell Agreement. FieldTurf shall not be responsible for the stability or the porosity of the <br />existing base or drainage system upon which the FieldTurf surface will be installed, nor any <br />construction or modification of existing installations around the field. If remediation of the existing <br />base is necessary, FieldTurf will assist in providing scope and costs. On occasion the existing <br />'header board' that is attached to the curb around the perimeter of an older field needs to be <br />replaced. We will inspect the header at Eddie West once the existing field is removed and offer <br />pricing to do this if necessary. <br />PRICE <br />The purchase price for the Product fully installed is below, plus any other permanent inlaid lines, <br />logos not listed, and any other unforeseen costs. <br />The Purchase Price is subject to increase if affected by a tax increase, new taxes, and levies or any <br />new legally binding imposition affecting the transaction. <br />Eddie West Football / Soccer Field Replacement: <br />FieldTurf Super Elite Vertex Prime w CORE series turf...... <br />Remove / Recycle Existing Field ......... $30,000 <br />Existing Base Fine-Tuned.................$18,000 <br />FieldTurf / Installed 81,246 sq ft <br />........ $402,356 <br />(10 Year Old Customer Savings: <br /><$37,500>) <br />FieldTurf CoolPlay................$40,623 <br />Permanent Football Markings ........... <br />No Charge <br />(10 Year Old Customer Savings: <br /><$17,500>) <br />7445 Cote-de-Liesse Road Suite 200, Montreal, QC, Canada H4T 1G2 9 Toll Free: 1-800-724-2969 • Website: http://www.fieldturf.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.