Laserfiche WebLink
Provided comprehensive multimodal transportation system for circulation of people and <br />goods. <br />Protected and encouraged active transportation (bicycle and pedestrian) travel and transit <br />connectivity. <br />Ensured adequate parking with consideration of strategies for the control of parking demand <br />such as improved transit service, amenities for bicyclists, and rideshare vehicles, and <br />strategies for shared parking opportunities in mixed -use and multiple -use development. <br />Projects Included: <br />• Anabella Hotel TIA <br />• Anaheim Platinum Triangle Model Runs #3 <br />• ATAM Model Runs — Trumark At Lewis <br />• Ball Road Basin ATAM Model Support <br />• Hampton Inn Traffic Study — 100 W Katella <br />• Link OC TIA Peer Review <br />• Nohl Ranch Condo TIA <br />• Quality Inn Traffic Study — 1441 S. Manchester <br />• TIA Peer Review — 901 E. South Street <br />• TIA Peer Review — Parking Study & TIA Packing District <br />• TIA Peer Review — Tract No 18045 — Anaheim <br />• TIA Radisson Hotel — Anaheim <br />ATMS MASTER PLAN UPDATE, GRANT SERVICES, ENGINEERING DESIGN SERVICES, AND <br />PROJECT MANAGEMENT SERVICES — CITY OF CORONA, CA <br />Reference Aaron Cox, Associate Engineer - Traffic, Public Works, City of Corona, 400 S. <br />Vicentia Ave., Corona, CA 92882 (951) 279-3515, Aaron.Cox@CoronaCA.gov <br />Duration November 2019 — Ongoing <br />The original Master Plan developed <br />by Iteris in 2006 followed a system <br />engineering approach that employed <br />an iterative process in assessing the <br />City's need and mapping those <br />needs to system solutions which <br />included the design and construction <br />of two phases. The City has <br />contracted Iteris to prepare an <br />update to the original Master Plan <br />effort which will research <br />technologies for IP-addressable <br />cameras, changeable message <br />signs, video detection, network <br />redesign, fiber management, data <br />analytics, connected vehicles, and <br />Gigabit Ethernet network. The <br />Master Plan will include a full Traffic <br />Budget $456,338 <br />Management Center (TMC) re- <br />design and cost. Iteris will use the master plan to help the City secure funding for future phases as <br />they continue to expand their ITS infrastructure. Once the Master Plan has been completed and <br />approved, Iteris will design Phase 3 and provide construction management and integration support. <br />Santa Ana, On -Call Transportation & Traffic Engineering Services (RFP No. 21-125) Iteris, Inc. 118 <br />