My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - On -Call Transportation and Traffic Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 17 - On -Call Transportation and Traffic Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:34:36 PM
Creation date
8/16/2023 11:43:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Project Schedule <br />Iteris has provided the following sample schedule as shown in Figure 3 for the recent Main Street RTSS Project. <br />Figure 3 — Proposed Project Schedule <br />1 <br />1.0 Project Management {PI Phase} <br />2-0 Data Collection <br />318 days <br />5S days <br />Mon 4/1/19 <br />Wed 6/17/2o <br />V <br />1! <br />qP <br />1♦ <br />-- <br />- - <br />— - - <br />— - - <br />— - <br />2D <br />21 <br />Tue 412/19 <br />Mon 6/17/19 <br />27 <br />3.0 Field Review and P5&E <br />4.0 Corridor 'Before' Studies <br />S.D Signal Tim irig Optimization and Implementation <br />6.0 Cnrridor'After' Studies <br />28 <br />40 days <br />Tue 412/19 <br />Mon 5/27/19 <br />33 <br />34 <br />41 days Fri 4/12/19 <br />Fri 617/19 <br />39 <br />40 <br />245 days Tue 4116119 <br />Mon 3/23/20 <br />51 <br />Fri Sf 1/20 <br />52 <br />3S days Mon 3f 16f20 <br />57 <br />58 <br />7.0 Synchronization System Construction <br />226 days Mon 4f 15/19 <br />Mon 2/24/20 <br />68 <br />&D Operations Maintenance and Monitoring Phase <br />8.1 Project Management (OMM Phase) <br />8.2 Continuing Signal Timing Support <br />9.D Project Report <br />9.1 Project Report (PI Phase) <br />543 days <br />541 days <br />521 days <br />568 days <br />25 days <br />Mon 6/1/20 <br />Wed 6f 3/20 <br />Mon 6f 1/20 <br />Mon 4/27/20 <br />Mon 4/27/20 <br />Wed 6/29/22 <br />Wed 6129/22 <br />Mon 5/30/22 <br />Wed 6/29/22 <br />Fri 5/29/20 <br />69 <br />70 <br />97 <br />99 <br />100 <br />101 <br />106 <br />9.2 Project Report (OMM Phase) <br />19.0 Traffic Signal Modeling Support <br />22 days <br />15 days <br />Tue 5131/22 <br />Mon 4115119 <br />Wed 6/29/22 <br />Fri S13/19 <br />V=9 <br />- - <br />111 <br />112 <br />Santa Ana, On -Call Transportation & Traffic Engineering Services (RFP No. 21-125) Iteris, Inc. 130 <br />