My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - On -Call Electrical Repair and Rehabilitation Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 19 - On -Call Electrical Repair and Rehabilitation Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:37:16 PM
Creation date
8/16/2023 11:45:33 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
2/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. Brey Electric, Inc. <br />Commercial -Industrial <br />408 Elm Ave. Beaumont, CA. 92223 <br />951-845-5438 FX 951-845-5642 <br />www.mbreyelectric.com <br />CA#581224 <br />DIR#1000005926 <br />City of Santa Ana <br />On -Call Electrical Repair & <br />Rehabilitation Services <br />RFP # 21-122 <br />Services Work Plan <br />• Establish initial communication guidelines and procedures with City of Santa Ana <br />personnel. <br />• MBE provides 24 hour emergency service and provides direct communication to a MBE <br />employee who will engage the appropriate response team as necessitated. <br />• For tasks requiring immediate attention as delineated by the City of Santa Ana, MBE will <br />dispatch required personnel within (60) minutes of receiving notice during normal <br />business hours for emergency repair services between (7:30AM — 6:0013M) M-F. <br />• City of Santa Ana may assign Work Authorization for scheduled and/or pre -arranged <br />projects in which MBE will assess and assign necessary personnel for the task including <br />providing any required submittals for review prior to commencement of authorized work. <br />• As tasks are assigned, MBE will evaluate the labor, material and equipment required to <br />complete the task and develop an estimate offering value engineering relative to the cost <br />of repair or replacement and advising the City of Santa Ana personnel. <br />• Once authorization to proceed is received, MBE will mobilize with all required labor, <br />materials, tools and equipment ready to initiate service requirements and perform the <br />task at hand. On site supervision will be provided at all times during the performance of <br />the work. <br />• MBE shall install all material and equipment as approved or specified in strict accordance <br />with manufacturer's written instructions. <br />• During the performance of each work authorization MBE will insure that safety is of <br />the highest standards and will make every effort to minimize disruption to City <br />activities or <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.