Laserfiche WebLink
Sinter -Pacific <br />6. Previous Relevant Projects <br />Saddleback College — IT IDF Room ePower Project <br />Installation of new underground wiring and conduit, electrical panels, transformers, receptacles, access panels, <br />thermostats, junction boxes, submersible electrical vaults, and steel cable troughs. <br />Contact: Louis Sessler, (949) 582-4947, Isessler@saddleback.edu <br />Location: 28000 Marguerite Parkway, Mission Viejo, CA 92692 <br />Original Value: $399,000.00 (including $42,000.00 allowance) <br />Total Value: $377,557.07 <br />Period of Performance: January 27, 2020—July 7, 2020 <br />City of Pico Rivera - Electrical Panel Replacement at Plant No. 2 <br />Capital Improvement Project No. 21297 <br />Electrical power upgrade for Water Plant. Installed new transformer, replaced new Main Switch Board (MSB) and <br />Motor Control Center (MCC). New electrical feed from SoCal Edison with trenching and new concrete pads. <br />Contact: Gabriel Gomez, (714) 732-0398, gabriel.gomez@libertyutilities.com <br />Location: 8316 Washington Blvd, Pico Rivera, CA 90660 <br />Original Value: $325,000.00 <br />Total Value: $334,689.21 (addition of cam locks on MSB, grounding rod and well) <br />Completion: August 2017 — February 2018 <br />City of Santa Ana - Lighting Upgrade, Structured Cabling, & Camera Systems <br />LED Lighting upgrade of all City Water Plants, including installing light poles and Camera Systems. <br />Personnel involved: Evan Kao, Project Engineer, Ben Hurtado, Primary Electrician <br />Contact: Cesar Barrera, 714-673-3408, cbarrera@santa-ana.org <br />Location: Water Resources Division, Santa Ana, 20 Civic Center Plaza, Santa Ana, CA 92701 <br />Original Value: $136,480 <br />Total Value: $160,560 <br />Period of Performance: September 2017 — March 2019 <br />City of Santa Ana — City Yard Electrical and Communication Upgrade. <br />Ran conduit and installed 85 Cosa Private Network, 9 SCADA, and 3 PLC drops from TR room and Server room <br />electrical panels to 1st floor Control room and 2nd floor open area. New junction boxes and face plates to <br />accommodate all new drop locations. <br />Contact: Miguel Renteria, 714-586-6294, mrenteria@santa-ana.org <br />Location: Santa Ana City Yard 220 S. Daisy Ave, Santa Ana, CA 92703 <br />Original Value: $80,191.45 <br />Total Value: $114,559.25 <br />Period of Performance: May 2021 <br />Kern County Superintendent of Schools - WAN Fiber Network <br />Installation of new WAN fiber network connecting 3 schools within Kern County Unified School District. Provided <br />boring and placement of manholes and conduit over 2 miles to provide high speed network connectivity. Provide <br />pathways, fiber terminations, single mode fiber optic patch cables, and cabinets. <br />Contact: Jenny Hannah, (661) 636-4000 <br />Location: 1300 17th St, Bakersfield, CA 93301 <br />Original Value: $178,532 <br />Total Value: $178,532 <br />Period of Performance: March 2017 <br />Additional references available upon request <br />6�Page <br />1421 Edinger Ave, Unit A (949) 529-5977 <br />Tustin, CA 92780 www.inter-Pacific.com <br />