Laserfiche WebLink
1 <br />E-5 P107 1" OCAL <br />1"OCAL <br />8.65" = 17.30' <br />$ <br />$ <br />1 <br />E-5 P107 1" OCAL ELBOW <br />1" OCAL ELBOW <br />1 <br />1 <br />$ <br />$ <br />E-5 P107 3#12 1#12 FROM MCC-010 TO AIR <br />CONDITIONING UNIT ACU-010 (VIA 30A/3P NON -FUSED <br />1 <br />DISCONNECT SWITCH) <br />3#12 1#12 <br />8.65" = 17.30' <br />$ <br />$ <br />1 <br />E-5 P108 1" OCAL <br />OCAL <br />11.93" = 23.86' <br />$ <br />$ <br />1 <br />E-5 P108 1" OCAL ELBOW <br />OCAL ELBOW <br />2 <br />2 <br />$ <br />$ <br />E-5 P108 2#12 1#12 FROM PDP-011 (IN MCC-010) TO <br />1 <br />EXHAUST FAN (CKT-17) <br />2#12 1#12 <br />11.93" = 23.86' <br />$ <br />$ <br />Copper Conductors: Comply with NEMA WC 70/ICEA 5-95- <br />1 <br />658 <br />$ <br />$ <br />LABOR *PRICE DOES NOT INCLUDE FURNISHING ANY <br />1 <br />1EQUIPMENT OR PARTS. ADDITIONAL FEES MAY APPLY <br />1 <br />1 $ 20,000.00 <br />$ 20,000.00 <br />Subtotal: <br />$ 20,000.00 <br />2 <br />Building and Site Electrical System (Well 32) <br />1 <br />$ <br />$ <br />2 <br />E-2 (2) FO102 - 3" OCAL QTY. x2 <br />E-2 (2) OCAL STICK <br />44.92" = 89.84' x2 <br />$ <br />$ - <br />E-2 (2) OCAL <br />2 <br />E-2 (2) FO102 - 3" OCAL ELBOWS QTY. x2 <br />ELBOWS <br />12 x2 <br />24 <br />$ <br />$ <br />E-2 (2) FO102 48 STRAND SINGLE MODE FIBER FROM <br />WELL 32 COMMUNICATION RACK TO JOHN GARTHE <br />48 STRAND SINGLE <br />2 <br />COMMUNICATION RACK - QTY. x2 <br />MODE FIBER <br />44.92" = 89.84' x2 <br />$ <br />$ <br />E-2 (2) SP101 - 3"CO OCAL FROM WELL 32 <br />COMMUNICATION RACK TOJOHN GARTHE <br />2 <br />COMMUNICATION RACK - FIBER OPTIC SPARE CONDUIT <br />E-2 (2) OCAL STICK <br />44.92" = 89.84' <br />$ <br />$ <br />E-2 (2) OCAL <br />2 <br />E-2 (2) SP101 - 3" OCAL ELBOWS <br />ELBOWS <br />12 <br />12 <br />$ <br />$ - <br />E-11 (1) PROVIDE A NEW STAINLESS STEEL NEMA 4X PULL <br />2 <br />BOX. <br />$ <br />$ <br />E-11 (2) LIGHT SWITCH (WP) AND FAN SWITCH (WP) <br />2 <br />SHALL BE MOUNTED NEAR TOP OF LADDER ENTRY. <br />$ <br />$ <br />E-11 (3) ROUTE CONDUITS INSIDE THE VAULTS EXPOSED <br />AND ALONG THE WALL WITH PVC COATES RIGID STEEL <br />2 <br />JCONDUIIT. <br />$ <br />$ <br />E-12 (1) COORDINATE THE INSTALLATION OF THE NEW <br />SWITCHBOARD "SWBD-010" AND RELOCATION OF THE KWH <br />2 <br />METER WITH SCE. <br />$ - <br />$ - <br />