My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - On -Call Electrical Repair and Rehabilitation Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 19 - On -Call Electrical Repair and Rehabilitation Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:37:16 PM
Creation date
8/16/2023 11:45:33 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
2/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-4 FO201 - 24 STRAND SINGLE MODE FIBER FROM JOHN <br />GARTHE COMMUNICATION <br />24 STRAND SINGLE <br />7 <br />TO RACK RIO-100 <br />MODE FIBER <br />203.53" = 407.06' <br />$ <br />$ - <br />E-4 SP203 - 3"OC OCAL FROM JOHN GARTHE <br />COMMUNICATION RACK TO RIO-100 - FIBER OPTIC SPARE <br />7 <br />CONDUIT <br />3"OC OCAL <br />203.53" = 407.06' <br />7 <br />E-4 SP203 - 3"OC OCAL ELBOW <br />3"OC OCAL ELBOW <br />2 <br />$ <br />$ <br />7 <br />E-4 (P301-P302-C301-C302) <br />7 <br />E-4 P301 - 1" OCAL STICK <br />1" OCAL STICKS <br />36" = 72' <br />7 <br />E-4 P301 - 1" OCAL ELBOW <br />1" OCAL ELBOWS <br />1 <br />E-4 P301 - 2#12 1#12 FROM PDP-200 <br />TO PRESSURE VAULT SUMP PUMP SMP-100 (VIA POWER <br />7 <br />PULL BOX) <br />2#12 1#12 <br />36" = 72' <br />E-4 P301 - 2#12 1#12 FROM PDP-200 <br />7 <br />TO PRESSURE VAULT FAN (VIA POWER PULL BOX) <br />2#12 1#12 <br />36" = 72' <br />E-4 P301 - 4#12 2#12 FROM PDP-200 <br />TO PRESSURE VAULT LIGHT AND RECEPTACLE (VIA POWER <br />7 <br />PULL BOX) <br />4#12 2#12 <br />36" = 72' <br />$ <br />$ <br />7 <br />E-4 P302 - 1" OCAL STICKS <br />1" OCAL STICKS <br />36" = 72' <br />$ <br />$ <br />7 <br />E-4 P302 - 1" OCAL ELBOWS <br />1" OCAL ELBOWS <br />1 <br />$ <br />$ <br />E-4 P302 - 2#12 1#12 FROM PDP-200 <br />7 <br />TO CHEMICAL VAULT FAN (VIA POWER PULL BOX) <br />2#12 1#12 <br />36" = 72' <br />$ <br />$ <br />E-4 P302 - 2#12 1#12 FROM PDP-CHEMICAL VAULT LIGHT <br />7 <br />AND RECEPTACLE (VIA POWER PULL BOX) <br />2#12 1#12 <br />36" = 72' <br />$ <br />$ <br />7 <br />E-4 C301 - 1" OCAL STICKS <br />1" OCAL STICKS <br />36" = 72' <br />$ <br />$ <br />7 <br />E-4 C301 - 1" OCAL ELBOWS <br />1" OCAL ELBOWS <br />1 <br />$ <br />$ <br />E-4 C301 - 4#14 1#14 FROM RIO-100 TO VAULT-YA-100 <br />AND VAULT-LSHH-100 <br />(PRESS. VAULT INTRUSION SWITCH AND <br />7 <br />FLOAT SWITCH. VIA CONTROL PULL BOX.) <br />4#14 1#14 <br />36" = 72' <br />$ <br />$ <br />7 <br />E-4 C302 - 1" OCAL STICKS <br />1" OCAL STICKS <br />36" = 72' <br />$ <br />$ <br />7 <br />E-4 C302 - 1" OCAL ELBOWS <br />1" OCAL ELBOWS <br />1 <br />$ <br />$ <br />E-4 C302 - 2#14 1#14 RIO-100 TO VAULT-YA-110 <br />7 <br />(CHEMICAL VAULT INTRUSION SWITCH) <br />2#14 1#14 <br />36" = 72' <br />$ <br />$ <br />E-8 (1) CONDUIT ROUTING IS SHOWN <br />DIAGRAMMATICALLY AND THEY <br />7 <br />SHALL BE ROUTED TO SUIT FIELD CONDITIONS. <br />$ <br />$ <br />E-8 (2) CONTRACTOR SHALL COORDINATE WITH ON -SITE <br />SODIUM HYPOCHLORITE GENERATION (OSHG) CONTRACTOR <br />AND THE CITY FOR CONDUIT STUB -UP LOCATION AND <br />7 <br />CONNECTION POINT. <br />$ <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.