My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - On -Call Electrical Repair and Rehabilitation Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Item 19 - On -Call Electrical Repair and Rehabilitation Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:37:16 PM
Creation date
8/16/2023 11:45:33 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
2/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E-8 (4) INSTALL THE REQUIRED WIRES BETWEEN THE <br />INDOOR AND <br />7 <br />OUTDOOR AC UNITS <br />$ - <br />$ <br />E-8 (5) INSTALL A NEW 200A, 480V, 30, 3W, NEMA 4X <br />STAINLESS STEEL <br />7 <br />PANEL BOARD "PDP-100". <br />PDP-100 <br />$ - <br />$ <br />E-8 (6) INSTALL A NEW 208/120V, 200A, 30, 4W NEMA 4X <br />STAINLESS <br />7 <br />STEEL PANEL BOARD "PDP-200" <br />PDP-200 <br />$ - <br />$ <br />E-8 (7) THE HYPOCHLORITE GENERATOR EQUIPMENT <br />SHALL BE <br />7 <br />PROVIDED AND INSTALLED BY OTHERS <br />$ - <br />$ <br />7 <br />E-11 VAULT ELECTRICAL PLANS <br />$ - <br />$ <br />E-11 (1) PROVIDE A NEW STAINLESS STEEL NEMA 4X PULL <br />7 <br />BOX. <br />$ - <br />$ <br />E-11 (2) LIGHT SWITCH (WP) AND FAN SWITCH (WP) <br />SHALL BE MOUNTED <br />7 <br />NEAR TOP OF LADDER ENTRY <br />$ - <br />$ <br />E-11 (3) ROUTE CONDUITS INSIDE THE VAULTS EXPOSED <br />AND ALONG THE <br />7 <br />WALL WITH PVC COATES RIGID STEEL CONDUIT <br />$ - <br />$ <br />7 <br />E-11 PRESSURE CONTROL VAULT PLAN <br />$ - <br />$ <br />7 <br />E-11 (3) P301 1" OCAL <br />1" OCAL STICK <br />18.6" = 37.20' <br />$ - <br />$ <br />E-11 (3) P301(1) 2#12 1#12 FROM PDP-200 <br />TO PRESSURE VAULT SUMP PUMP SMP-100 (VIA POWER <br />7 <br />PULL BOX) <br />2#12 1#12 <br />18.6" = 37.20' <br />$ - <br />$ <br />E-11 (3) P301(2) 2#12 1#12 FROM PDP-200 <br />7 <br />TO PRESSURE VAULT FAN (VIA POWER PULL BOX) <br />2#12 1#12 <br />$ - <br />$ <br />E-11 (3) P301(3) 4#12 2#12 FROM PDP-200 <br />TO PRESSURE VAULT LIGHT AND RECEPTACLE (VIA POWER <br />7 <br />PULL BOX) <br />4#12 2#12 <br />$ - <br />$ <br />7 <br />E-11 C301- 1" OCAL STICKS <br />1" OCAL STICKS <br />7" = 14' <br />$ - <br />$ <br />7 <br />E-11 C301- 1" OCAL ELBOWS <br />1" OCAL ELBOWS <br />1 <br />$ - <br />$ <br />E-11 C301- 4#14 1#14 FROM RIO-100 TO VAULT-YA-100 <br />AND VAULT-LSHH-100 <br />(PRESS. VAULT INTRUSION SWITCH AND <br />7 <br />FLOAT SWITCH. VIA CONTROL PULL BOX.) <br />4#14 1#14 <br />7" = 14' <br />$ - <br />$ <br />7 <br />E-11 CHEMICAL INJECTION VAULT PLAN <br />$ - <br />$ <br />7 <br />E-11 (3) P302 1" OCAL <br />1" OCAL STICK <br />18.6" = 37.20' <br />$ - <br />$ <br />E-11 (3) P302(1) 2#12 1#12 FROM PDP-200 TO CHEMICAL <br />7 <br />VAULT FAN (VIA POWER PULL BOX) <br />2#12 1#12 <br />18.6" = 37.20' <br />$ - <br />$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.