Laserfiche WebLink
9 <br />(2) RIGHT - 3/4" OCAL ELBOWS <br />3/4" OCAL ELBOWS <br />1 <br />1 <br />$ <br />$ <br />9 <br />(3) FIXTURE SHALL BE EQUIPPED WITH EMERGENCY PACK. <br />1 <br />$ <br />$ <br />9 <br />(4) EXTERIOR WALL MOUNTED FIXTURES SHALL BE <br />1EQUIPPED WITH PHOTOCELL <br />1 <br />$ <br />$ <br />9 <br />LIGHTING INSTALLATION <br />$ <br />$ <br />9 <br />LABOR *PRICE DOES NOT INCLUDE FURNISHING ANY <br />EQUIPMENT OR PARTS. ADDITIONAL FEES MAY APPLY <br />1 <br />$ <br />10,000.00 <br />$ <br />10,000.00 <br />Subtotal: <br />$ <br />10,000.00 <br />10 <br />Fiber Optics Conduits (3" Conduits) <br />3900 <br />$ <br />37.19 <br />$ <br />145,033.20 <br />10 <br />***PRICE DOES NOT INCLUDE LABOR <br />$ <br />- <br />$ <br />- <br />10 <br />TRENCH OR BORING *TRENCHING MAY HAVE <br />ADDITIONAL COSTS <br />BORING <br />1 <br />$ <br />90,540.00 <br />$ <br />90,540.00 <br />Subtotal: <br />$ <br />235,573.20 <br />11 <br />Fiber Optic Pull Box <br />8 <br />$ <br />4,875.00 <br />$ <br />39,000.00 <br />11 <br />E-2 24" X 36" X 36" FIBER OPTIC CABLE PULL BOX <br />$ <br />- <br />$ <br />11 <br />EQUIPMENT RENTAL <br />1 <br />$ <br />2,500.00 <br />$ <br />2,500.00 <br />11 <br />LABOR <br />1 <br />$ <br />32,000.00 <br />$ <br />32,000.00 <br />Subtotal: <br />$ <br />73,500.00 <br />12 <br />Mobilization/Demobilization <br />1 <br />1 $ <br />15,000.001 <br />$ <br />15,000.00 <br />Subtotal: <br />$ <br />15,000.00 <br />13 <br />Commissioning and Training (EA) FOR 3 VFD <br />3 <br />$ <br />13,500.00 <br />$ <br />40,500.00 <br />Subtotal: <br />$ <br />40,500.00 <br />"14�As <br />Built Plans, O&M Manuals and Warranties <br />1 <br />$ <br />3,000.00 <br />$ <br />3,000.00 <br />Subtotal: <br />$ <br />3,000.00 <br />Total <br />$ <br />778,573.20 <br />