Laserfiche WebLink
Value of Remainder in the After Condition Before Considering Benefits <br />Land Area % Property Indicated <br />Property (SF) $/SF Rights Value <br />Larger Parcel in After Condition 18,194 $80.00 100% $1,455,520 <br />Severance Damages <br />California Eminent Domain Law defines Damage to the remainder as the damage, if any, caused by either <br />or both of the following: a) The severance of the remainder from the part acquired, b) The construction <br />and use of the project for which the property is acquired in the manner proposed by the plaintiff whether <br />or not the damage is caused by a portion of the project located on the part acquired. <br />Damage considerations include issues related to air, light, and view obstruction, a change in utility due to <br />shape, topography, access or other physical impairment, or a reduction in site amenities enjoyed in the <br />"before" condition. <br />In the after condition, the use and utility of the larger parcel will be unchanged. No damages are shown, <br />as follows: <br />Severance Damages <br />Value of the Remainder as Part of the Whole - Land Only $1,455,520 <br />Value of the Remainder in the After Condition - Land Only $1,455,520 <br />Severance Damages $0 <br />Value of the Remainder in the After Condition After Considering Benefits <br />Briefly stated, benefits are defined as any value enhancement resulting from the project. As cited in Los <br />Angeles County Metropolitan Transit Agency v. Continental Development Corporation, 97 Daily Journal <br />D.A.R. 11021, "...all reasonably certain, non -speculative benefits resulting from the project may offset <br />against severance damages..." <br />Although the community in general may benefit from the proposed Project, I have found no evidence of <br />benefits accruing to the Remainder in the "After" condition. <br />The construction of the project in the manner proposed may bring benefits to the area in the form of <br />traffic allowance and safety, and, hence, value enhancement; however, at this time, such benefits are not <br />quantifiable. The value of the remainder in the after condition after considering benefits is not changed <br />from the value of the remainder in the after condition before considering benefits; thus, no benefits are <br />shown, as follows: <br />Benefits <br />Remainder in the After Condition After Considering Benefits - Land Only $1,455,520 <br />Remainder in the After Condition Before Considering Benefits - Land Only $1,455,520 <br />Benefits $0 <br />Fair Market Value of Temporary Construction Easement <br />A temporary construction easement is proposed to allow for the construction of the project as proposed. <br />A review of the proposed agreement to assess the degree of encumbrance on the property was <br />completed to ascertain which rights the fee owner retains. The impact on value may be a function of the <br />Page 5 <br />