Laserfiche WebLink
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br /> CITY OF SANTA ANA <br /> Mitigation Monitoring and Reporting Program <br /> 1.4 MITIGATION MONITORING PROGRAM ORGANIZATION <br /> CEQA requires that a reporting or monitoring program be adopted for the conditions of project approval that <br /> are necessary to mitigate or avoid significant effects on the environment(Public Resources Code 21081.6).The <br /> mitigation monitoring and reporting program is designed to ensure compliance with adopted mitigation <br /> measures during project implementation. For each mitigation measure recommended in the Draft PEIR and <br /> Recirculated Draft PEIR, specifications are made herein that identify the action required and the monitoring <br /> and reporting that must occur. In addition, a responsible agency is identified for verifying compliance with <br /> individual conditions of approval contained in the MMRP. To effectively track and document the status of <br /> mitigation measures,a mitigation matrix has been prepared(see Table 1-3). <br /> City Council 32 — 102 1/18/2022 <br /> Page 6 PlaceWlorks <br />