My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update <br /> January 18, 2022 <br /> Page 12 <br /> environmental topics of Air Quality, Hazards, and Recreation. The Recirculated Draft <br /> PEIR also includes an updated/supplemented Project Alternatives chapter containing a <br /> new Reduced Park Demand Alternative to reduce the significant recreation impacts <br /> associated with the proposed GPU, as well as an additional mitigation measure and <br /> reference to General Plan policy and implementation action refinements. The <br /> Recirculated Draft PEIR incorporates the previous Draft PEIR by reference, as <br /> appropriate. In particular, the previous Draft PEIR document and its appendices are <br /> referenced for long and/or technical descriptions of the environmental setting that remain <br /> applicable to the updated GPU. <br /> Three project alternatives were analyzed within the Final PEIR (October 2020) document. <br /> These included a no project alternative, where the existing General Plan document would <br /> remain in effect (Alternative 1); a reduced intensity alternative with two focus areas (55 <br /> Freeway/Dyer Road and South Bristol Street) would be reduced to approximately 50 <br /> percent of the maximum densities allowed by their respective land use designation <br /> (Alternative 2); and build out of the site to be consistent with the Southern California's <br /> Association of Regional Government's (SCAG) RTP/SCS projections, which could result <br /> in an approximate 75 percent reduction in both the number of allowable units and <br /> commercial/industrial square footage (Alternative 3). <br /> The Recirculated Draft PEIR (August 2021) introduces a reduced park demand project <br /> (Alternative 4) that reduces residential growth by 11,225 units by eliminating or reducing <br /> residential land uses and intensity in the five focus areas. Overall, nonresidential square <br /> footage would be reduced by a total of approximately 2.8 million square feet within the <br /> focus areas compared to the proposed GPU. New residential growth under this alternative <br /> would largely be in currently planned areas that are generally near a number of existing <br /> park facilities, with some residential growth would be introduced into two focus areas at <br /> substantially lower intensities to reduce the potential impact on park facilities. <br /> As required, the Draft Recirculated PEIR (August 2021) was circulated for public review <br /> between August 6, 2021 and September 20, 2021, with the Notice of Availability (NOA) <br /> instructing reviewers to only submit comments on the three revised chapters included in <br /> the Recirculated Draft PEIR. The comments in the original Final PEIR adequately address <br /> comments received on portions of the Draft PEIR that have not been recirculated. During <br /> the review and comment period, staff held a public hearing to receive comments on the <br /> Draft Recirculated PEIR and a work-study session with the Planning Commission on <br /> September 13, 2021 . <br /> The Draft PEIR (August 2020), Final PEIR (October 2020), and Final Recirculated PEIR <br /> including all report appendices, are posted on the City's website. https://www.santa- <br /> ana.org/general-plan <br /> The City has evaluated the comments received from persons and agencies for both the <br /> Draft PEIR (August 2020) and Recirculated Draft PEIR (August 2021), and completed <br /> City Council 32 — 12 1/18/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.