Laserfiche WebLink
3) Section III provides a summary of previous environmental reviews related to the project area <br /> that took place prior to the environmental review done specifically for the project, and a <br /> summary of public participation in the environmental review for the project. <br /> 4) Section IV sets forth findings regarding the environmental impacts that were determined to <br /> be—as a result of the Notice of Preparation (NOP) and consideration of comments received <br /> during the NOP comment period—either not relevant to the project or clearly not at levels that <br /> were deemed significant for consideration given the nature and location of the proposed <br /> project. <br /> 5) Section V sets forth findings regarding significant or potentially significant environmental <br /> impacts identified in the PEIR that the City has determined are either not significant or can <br /> feasibly be mitigated to a less than significant level through the imposition of project design <br /> features and/or mitigation measures. In order to ensure compliance and implementation, all <br /> of these measures are included in the Mitigation Monitoring and Reporting Program ("MMRP") <br /> for the project and adopted as conditions of the project by the Lead Agency. Where potentially <br /> significant impacts can be reduced to less than significant levels through adherence to project <br /> design features and/or mitigation measures, these findings specify how those impacts were <br /> reduced to an acceptable level. Section V also includes findings regarding those significant or <br /> potentially significant environmental impacts identified in the PEIR that will or may result from <br /> the project and which the City has determined cannot feasibly be mitigated to a less than <br /> significant level. <br /> 6) Section VI sets forth findings regarding alternatives to the proposed project. <br /> 7) Section VII sets forth the statement of overriding considerations for the proposed project. <br /> 8) Section VIII sets forth the resolution regarding certification of the PEIR <br /> 9) Section IX sets for the resolution adopting a mitigation and monitoring plan for the proposed <br /> project. <br /> 10)Section X sets for the resolution regarding custodian of records for the proposed project. <br /> B. RECORD OF PROCEEDINGS <br /> For purposes of CEQA and these Findings, the Record of Proceedings for the proposed project <br /> consists of the following documents and other evidence, at a minimum: <br /> ■ The NOP and all other public notices issued by the City in conjunction with the proposed <br /> project <br /> ■ The Draft PEIR for the proposed project <br /> ■ The Recirculated Draft PEIR <br /> Santa Ana General Plan Update <br /> CE 5T ac an Statement 32 — 27 2 <br /> Of ri ing onsiderations -4- 61 /Rer�0 2 1 <br />