My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Santa Ana Boulevard between French Street and Santiago Street (currently Primary <br /> Arterial) <br /> • Santa Ana Boulevard between Raitt Street and Flower Street (currently Major Arterial) <br /> • Cambridge Street between Fairhaven Avenue and SR-22 freeway (currently Local <br /> Arterial) <br /> • Hazard Avenue between Euclid Street and Harbor Boulevard (currently Secondary <br /> Arterial) <br /> • Halladay Avenue between Warner Avenue and Dyer Road (currently Secondary Arterial) <br /> • McFadden Avenue between Harbor Boulevard and Grand Avenue (currently Secondary <br /> Arterial) <br /> • Broadway between 1 st Street and 17th Street (currently Secondary Arterial) <br /> • 4th Street between French Street and Grand Avenue (currently Primary/Secondary <br /> Arterial) <br /> • Fairhaven Avenue from Grand Avenue to Tustin Avenue (currently Secondary Arterial) <br /> ■ Reclassified as Primary Arterial: <br /> • Santa Ana Boulevard between Flower Street and Ross Street (currently a Major Arterial) <br /> • 1st Street between Bristol Street and Tustin Avenue (currently Major Arterial) <br /> ■ Reclassify as Collector Arterial: <br /> Civic Center Drive between French Street and Santiago Street (currently a Secondary <br /> Arterial) <br /> ■ Add the following to the MPSH as Divided Collector Arterial: <br /> Greenville Street between Segerstrom Avenue and Warner Avenue <br /> ■ Add the following to the MPSH as Collector Streets: <br /> • Civic Center Drive between Spurgeon Street and Santiago Street (currently Local Street) <br /> • Broadway from Anahurt Street to Main Street (currently Local Road) <br /> ■ Remove the following from the MPSH <br /> Memory Lane from the City Center Drive to SR-22 <br /> Wright Street from 14th Street to Fruit Street <br /> 4th Street from French Street to Ross Street <br /> Washington Avenue from Broadway to Main Street <br /> 10th street from Broadway to Main Street <br /> Columbine Avenue from Main Street to 55 FWY <br /> Halladay street from Dyer Road to Alton pkwy <br /> Santa Ana General Plan Update <br /> CE i i 5T ac an Statement 32 — 33 1 1 / 02 <br /> Of ve ri ing onsiderations -10- 61A'Rer 021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.