My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specific Plan/Special Zoning <br /> There are seven planning areas that represent specific plans and other special zoning areas that <br /> were previously adopted: Adaptive Reuse Project Incentive Area (2014), Bristol Street Corridor <br /> Specific Plan (1991/2018), Harbor Mixed Use Transit Corridor Specific Plan (2014), MainPlace <br /> Specific Plan (2019), Metro East Mixed-Use Overlay Zone (2007/2018), Midtown Specific Plan <br /> (1996), and Transit Zoning Code Specific Development (2010). The most recent <br /> adoption/amendment date for each document is noted in parentheses. <br /> Adaptive Reuse Project Incentive Area <br /> The Adaptive Reuse Ordinance, Section 41-1651 of the Santa Ana Municipal Code, provides <br /> alternative building and fire standards for the conversion of eligible buildings, or portions thereof, <br /> from nonresidential uses to dwelling units, guest rooms or joint living, and work quarters. Eligible <br /> structures are buildings within the Adaptive Reuse project incentive area that were constructed in <br /> accordance with building and zoning codes in effect prior to July 1, 1974, or which have been <br /> determined to be a Historically Significant. The Project Incentive Area includes properties in the <br /> Midtown Specific Plan area; the Transit Zoning Code area; the Metro East Mixed-Use Overlay <br /> Zone; the North Main Street Corridor on both sides of Main Street, from 17th Street to the <br /> northernmost MainPlace Drive; and the East 1 st Street Corridor on both sides of 1 st Street from <br /> Grand Avenue to Elk Lane. Residential uses are allowed in the Project Incentive Area irrespective <br /> of the underlying zoning as part of an approved Adaptive Reuse Project. <br /> Harbor Mixed Use Transit Corridor Specific Plan <br /> The Harbor Mixed Use Transit Corridor Specific Plan covers the 2.5-mile segment of Harbor <br /> Boulevard on the west side of Santa Ana. The approximately 305-acre planning area includes <br /> parcels adjacent to Harbor Boulevard between Westminster Avenue and Lilac Avenue as well as <br /> parcels along Westminster Avenue, 1st Street, and 5th Street. The Harbor Mixed Use Transit <br /> Corridor Specific Plan creates the zoning necessary to take advantage of the regional and local <br /> transit investments made along and around Harbor Boulevard. The plan expands development <br /> options to include residential alongside or integrated into a mix of nonresidential uses. <br /> MainPlace Specific Plan <br /> The purpose of the MainPlace Specific Plan is to transform MainPlace mall into a family-oriented <br /> retail, entertainment, and dining destination. The plan creates a mixed-use urban village with a <br /> revitalized mall at its central core. The Specific Plan area is on the north edge of Santa Ana, <br /> between Main Street on the east and SR-22 and 1-5 to the north and west. The property is <br /> identified in the current General Plan land use element as District Center. The District Center <br /> designation includes the major activity areas of the city, designed to serve as anchors to the city's <br /> commercial corridors and to accommodate major development activity. No General Plan <br /> amendment is required for the specific plan, and the MainPlace Specific Plan is the zoning for the <br /> property and defines the allowable uses within its boundaries. <br /> Santa Ana General Plan Update <br /> CE 5T ac an Statement 32 — 37 2 <br /> Of ri ing onsiderations -14- 61 o er�0 2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.