My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V. FINDINGS REGARDING POTENTIALLY SIGNIFICANT ENVIRONMENTAL IMPACTS <br /> The following potentially significant environmental impacts were analyzed in the PEIR, and the <br /> effects of the project were considered. Because of environmental analysis of the project and the <br /> identification of relevant General Plan policies; compliance with existing laws, codes, and statutes; <br /> and the identification of feasible mitigation measures, some potentially significant impacts have <br /> been determined by the City to be reduced to a level of less than significant, and the City has <br /> found—in accordance with CEQA Section 21081(a)(1) and State CEQA Guidelines Section <br /> 15091(a) (1)—that"Changes or alterations have been required in, or incorporated into, the project <br /> which mitigate or avoid the significant effects on the environment." This is referred to herein as <br /> "Finding 1." <br /> Where the City has determined—pursuant to CEQA Section 21081(a)(2) and State CEQA <br /> Guidelines Section 15091(a)(2)—that "Those changes or alterations are within the responsibility <br /> and jurisdiction of another public agency and have been, or can and should be, adopted by that <br /> other agency," the City's finding is referred to herein as "Finding 2." <br /> Where, as a result of the environmental analysis of the project, the City has determined that either <br /> (1) even with the identification of project design features, compliance with existing laws, codes <br /> and statutes, and/or the identification of feasible mitigation measures, potentially significant <br /> impacts cannot be reduced to a level of less than significant, or (2) no feasible mitigation <br /> measures or alternatives are available to mitigate the potentially significant impact, the City has <br /> found in accordance with CEQA Section 21081(a)(3) and State CEQA Guidelines Section <br /> 15091(a)(3) that "Specific economic, legal, social, technological, or other considerations, <br /> including considerations for the provision of employment opportunities for highly trained workers, <br /> make infeasible the mitigation measures or alternatives identified in the environmental impact <br /> report." This is referred to herein as "Finding 3." <br /> A. IMPACTS MITIGATED TO LESS THAN SIGNIFICANT <br /> The following summary describes impacts of the proposed project that, without mitigation, would <br /> result in significant adverse impacts. Upon implementation of the mitigation measures provided <br /> in the PEIR, the impacts would be considered less than significant. <br /> 1. Air Quality <br /> Impact 5.2-6: Industrial land uses accommodated under the General Plan update could <br /> create other emissions, such as those leading to objectionable odors, that <br /> would adversely affect a substantial number of people. <br /> Industrial land uses associated with the GPU may generate potentially significant odor impacts <br /> for a substantial number of people. Impacts from potential odors generated from residential and <br /> other nonresidential land uses associated with the GPU are considered less than significant. <br /> Impacts associated with construction-generated odors are considered less than significant. <br /> Santa Ana General Plan Update <br /> CE 5T ac an Statement 32 — 49 2 <br /> Of ri ing onsiderations -26- 61 /Rer�0 2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.