My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• GHG inventories of existing and forecast year GHG levels. <br /> • Tools and strategies for reducing GHG emissions to ensure a trajectory with the <br /> long-term GHG reduction goal of Executive Order S-03-05. <br /> • Plan implementation guidance that includes, at minimum, the following <br /> components consistent with the proposed CAP: <br /> ■ Administration and Staffing <br /> ■ Finance and Budgeting <br /> ■ Timelines for Measure Implementation <br /> ■ Community Outreach and Education <br /> ■ Monitoring, Reporting, and Adaptive Management <br /> ■ Tracking Tools <br /> Finding <br /> Finding 3. Changes or alterations have been required in, or incorporated into, the GPU that avoid <br /> or substantially lessen the significant environmental effect as identified in the PEIR. These <br /> changes are identified in the form of the mitigation measure above. The City of Santa Ana hereby <br /> finds that implementation of the mitigation measure is feasible, and the measure is therefore <br /> adopted. <br /> The City finds that there are no other mitigation measures that are feasible, taking into <br /> consideration specific economic, legal, social, technological or other factors, that would mitigate <br /> this impact to a less-than-significant level, and further, that specific economic, legal, social, <br /> technological, or other considerations, including considerations for the provision of employment <br /> opportunities for highly trained workers, make infeasible the alternatives identified in the PEIR, as <br /> discussed in Section G of these Findings (Public Resources Code§§21081(a)(1), (3); Guidelines <br /> §§ 15091(a)(1), (3)). As described in the Statement of Overriding Considerations, the City has <br /> determined that this impact is acceptable because specific overriding economic, legal, social, <br /> technological, or other benefits, including regionwide or statewide environmental benefits, of the <br /> GPU outweigh its significant effects on the environment. <br /> 4. Noise <br /> Impact 5.12-1: Construction activities associated with buildout of the plan area would <br /> result in temporary noise increases at sensitive receptors. <br /> Support for this environmental impact conclusion is fully discussed in Section 5.12, Noise, starting <br /> on page 5.12-29 of the Updated Draft PEIR. <br /> Implementation of Mitigation Measure N-1 would reduce potential noise impacts during <br /> construction to the extent feasible. However, due to the potential for proximity of construction <br /> activities to sensitive uses, the number of construction projects occurring simultaneously, and the <br /> potential duration of construction activities, construction noise could result in a temporary <br /> Santa Ana General Plan Update <br /> CE 5T ac an Statement 32 — 71 2 <br /> Of ri ing onsiderations -48- 61c o er�0 2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.