My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X. RESOLUTION REGARDING CONTENTS AND CUSTODIAN OF RECORDS <br /> The documents and materials that constitute the record of proceedings on which these findings <br /> have been based are located at the City of Santa Ana Planning Division Counter. The custodian <br /> for these records is the City of Santa Ana. This information is provided in compliance with Public <br /> Resources Code section 21081.6. <br /> The record of proceedings for the City's decision on the project consists of the following <br /> documents, at a minimum: <br /> 1. The NOP and all other public notices issued by the City in conjunction with the project. <br /> 2. The Draft PEIR for the Santa Ana General Plan Update. <br /> 3. All comments submitted by agencies or members of the public during the 45-day comment <br /> period on the Draft PEIR and the 20-day extension to the comment period. <br /> 4. The Final PEIR for the Santa Ana General Plan Update, including comments received on the <br /> Draft PEIR, responses to those comments, and technical appendices. <br /> 5. The Recirculated Draft PEIR for the Santa Ana General Plan Update. <br /> 6. All comments submitted by agencies or members of the public during the 45-day comment <br /> period on the Recirculated Draft PEIR. <br /> 7. The Final Recirculated PEIR for the Santa Ana General Plan Update, including comments <br /> received on the Recirculated Draft PEIR, responses to those comments, and technical <br /> appendices. <br /> 8. The Mitigation Monitoring and Reporting Plan for the project. <br /> 9. All findings, resolutions, and ordinances adopted by the City in connection with the General <br /> Plan Update, and all documents cited or referred to therein. <br /> 10. All reports, studies, memoranda, maps, staff reports, or other planning documents relating to <br /> the project prepared by the City, consultants to the City, or responsible or trustee agencies <br /> with respect to the City's compliance with the requirements of CEQA and with respect to the <br /> City's action on the Santa Ana General Plan Update. <br /> 11. All documents submitted to the City by other public agencies or members of the public in <br /> connection with the General Plan Update PEIR up through project approval. Matters of <br /> common knowledge to the City, including, but not limited to federal, state, and local laws and <br /> regulations. <br /> 12. Any documents expressly cited or referenced in these findings, in addition to those cited <br /> above. <br /> Santa Ana General Plan Update <br /> CE 5T ac an Statement 32 — 91 2 <br /> Of ri ing onsiderations -68- 61 /Rer�0 2 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.