My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 32 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:43:13 PM
Creation date
8/16/2023 2:43:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
32
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Introduction <br /> 1.1 PURPOSE OF MITIGATION MONITORING AND REPORTING <br /> PROGRAM <br /> This Mitigation Monitoring and Reporting Program (MMRP) has been developed to provide a vehicle to <br /> monitor mitigation measures and conditions of approval outlined in the Final Recirculted Program <br /> Environmental Impact Report. The MMRP has been prepared in conformance with Section 21081.6 of the <br /> Public Resources Code and City of Santa Ana monitoring requirements. Section 21081.6 states: <br /> (a) When making the findings required by paragraph (1) of subdivision subsection (a) of <br /> Section 21081 or when adopting a mitigated negative declaration pursuant to paragraph(2) of <br /> subdivision (c) of Section 21080,the following requirements shall apply: <br /> (1)The public agency shall adopt a reporting or monitoring program for the changes made <br /> to the project or conditions of project approval, adopted in order to mitigate or avoid <br /> significant effects on the environment. The reporting or monitoring program shall be <br /> designed to ensure compliance during project implementation. For those changes which <br /> have been required or incorporated into the project at the request of a responsible agency <br /> or a public agency having jurisdiction by law over natural resources affected by the project, <br /> that agency shall,if so requested by the lead agency or a responsible agency,prepare and <br /> submit a proposed reporting or monitoring program. <br /> (2) The lead agency shall specify the location and custodian of the documents or other <br /> material which constitute the record of proceedings upon which its decision is based. <br /> (b) A public agency shall provide that measures to mitigate or avoid significant effects on the <br /> environment are fully enforceable through permit conditions,agreements,or other measures. <br /> Conditions of project approval may be set forth in referenced documents which address <br /> required mitigation measures or, in the case of the adoption of a plan,policy,regulation, or <br /> other public project,by incorporating the mitigation measures into the plan,policy,regulation, <br /> or project design- <br /> (c) Prior to the close of the public review period for a draft environmental impact report or <br /> mitigated negative declaration,a responsible agency,or a public agency having jurisdiction over <br /> natural resources affected by the project, shall either submit to the lead agency complete and <br /> detailed performance objectives for mitigation measures which would address the significant <br /> effects on the environment identified by the responsible agency or agency having jurisdiction <br /> over natural resources affected by the project,or refer the lead agency to appropriate,readily <br /> available guidelines or reference documents. Any mitigation measures submitted to a lead <br /> City Council 32 — 97 1/18/2022 <br /> October 2021 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.