My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Downtown Flood Reduction and Stormwater Infiltration Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 10 - Downtown Flood Reduction and Stormwater Infiltration Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 2:48:40 PM
Creation date
8/16/2023 2:48:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
10
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Upgrade existing stormdrain infrastructure along 3rd Street, <br />installation of a subsurface stormwater infiltration system, and <br />redevelopment of a City-owned parking lot to include stormwater <br />Best Management Practices (BMPs), drought tolerant landscaping, <br />and interpretive signage. <br />PROJECT NEED: <br />The City experiences significant flooding during intense rain events, <br />particularly in the Downtown area. This multi-benefit project will help <br />alleviate flooding via the reconstruction and upgrade of the existing <br />stormdrain infrastructure along 3rd Street, and construction of a <br />subsurface infiltration system that will capture and infiltrate stormwater. <br />PROJECT TITLE: <br />Downtown Flood Reduction and <br />Stormwater Infiltration Project <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting <br />Improvements <br />Storm Drain/Water Quality <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Craig Foster, NPDES Manager 08-Dec-2021 <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 3,454,650 ------ <br />Engineering 325,000 ------ <br />Planning 20,350 ------ <br />TOTAL 3,800,000 ------ <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />3,800,000 ------ <br />TOTAL 3,800,000 ------
The URL can be used to link to this page
Your browser does not support the video tag.