My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Water Control Panel Building Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 23 - Water Control Panel Building Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:04:19 PM
Creation date
8/16/2023 3:00:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ KDC systems <br />An FMCCR Company <br />For control panels with PLCs we will verify 1/0 checkout and any applicable networks. <br />We will configure required 1/0 in a PLC test program and verify proper digital input <br />operation by jumpers and digital outputs by forcing and verifying relays and lights. <br />Analog inputs will be verified using signal generators and analog outputs will be <br />confirmed using multimeters. <br />Once KDC has completed all testing and verification, the same test will be repeated with <br />the City's Representative and results documented on City's Control Panel Testing form. <br />3.3. Post -Installation Field Testing <br />Once system installation has been successfully completed and installed, we will perform <br />a site acceptance test. We will test the full operation and functionality of the completed <br />system in the SAT with a City Representative. <br />Once all operation and functionality are confirmed and approved by the City Personnel <br />in the SAT, we will commence on -site closeout and final completion of the project. <br />During on -site closeout, we will review panel drawings for any redlines, changes or <br />corrections and make sure these are implemented and captured on the drawings. We <br />will make sure any non -conformances have been corrected and re -tested. We will clean <br />and vacuum the panel and take detailed photos after installation. <br />For in -office closeout we will update drawings to reflect as -built condition and provide <br />all records including photos and schematics to the City upon closeout of the project. <br />3.4. Panel Design Services <br />Upon request by the City, we will provide control panel design services that conform to <br />City standards. <br />Depending on the application, the drawing sets will include Panel Layouts, Power <br />Distribution, Network Diagrams, 10 Drawings and a Bill of Materials (these will reference <br />the Layout Drawings and part numbers). <br />Page 11 <br />KDC Systems <br />An FMCCR Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.