My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Water Control Panel Building Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 23 - Water Control Panel Building Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:04:19 PM
Creation date
8/16/2023 3:00:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Basic Programming of PLCs, Festo <br />■ Intermediate Programming of PLCs, Festo <br />■ PLC Redundancy, Aryan Elmosanaat Training Center <br />■ Introduction to Industrial Profibus, Kian Control Engineering Co. Ltd. <br />■ Modbus, Aryan Elmosanaat Training Center <br />■ Introduction to Simatic WINCC (Siemens SCADA), Kian Control Engineering Co. Ltd. <br />■ Variable Frequency Drives, E and M <br />■ Introduction to EPLAN Electric, Kian Control Engineering Co. Ltd. <br />■ General Principles of Metrology & Calibration, Khat Ramz Co.Ltd. <br />Recent Projects: <br />■ Gilead Clinical Flex Fill Line and Second Formulation Suite <br />Instrument and panel design. <br />In -Current <br />PLC, HMI and SCADA programming. <br />■ Orange County Water District Ground Water Replenishment System <br />Instrument and panel design. <br />In -Current <br />PLC, HMI and SCADA programming. <br />■ City of Santa Ana Well 16 and 33 SA-5. <br />PLC and HMI programming. <br />2019 <br />■ Irvine Ranch Water District Michelson Water Recycling Plant Biosolids and Energy Recovery <br />Facilities <br />SCADA programming. <br />2019 <br />■ Edwards Air Force Base ACU and Aircraft Support Equipment Upgrades. <br />PLC, HMI and SCADA programming, Commissioning, Startup. <br />2018 <br />■ Automation Plating Corporation Plating Line PLC Upgrade. <br />PLC and HMI programming, Commissioning, Startup. <br />2018 <br />■ Water Replenishment District of Southern California Goldsworthy Desalter Expansion <br />Commissioning, Loop check, FAT and PLC program modification. <br />2017 <br />■ Global Harvest Foods Mixing System. <br />Panel Design, PLC and SCADA programming, Commissioning, Startup. <br />2017 <br />■ City of San Clemente Marblehead Coastal Urban Runoff System. <br />PLC and HMI programming, Loop check and commissioning. <br />2017 <br />■ MWD Henry J. Mills WTP Industrial Wastewater Handling Improvement. <br />Commissioning Plan, Instrument and control system training. <br />2017 <br />■ Western Riverside County Regional Wastewater Authority 14MGD Plant Expansion. <br />Commissioning Plan for whole Plant. <br />2016 <br />■ Irvine Ranch Water District Baker Water Treatment Plant <br />Control Panel FDT, Instrument Setup and calibration, Loop checks. <br />2016 <br />■ MWD Weymouth Water Treatment Plant. Oxidation and Ozonation Facilities. <br />Instrument setup and calibration. Loop checks, Instrument training. <br />2015 - 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.