My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Water Control Panel Building Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 23 - Water Control Panel Building Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:04:19 PM
Creation date
8/16/2023 3:00:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. FEE <br />KDC Systems is offering the rates listed below for work conducted under the proposed contract. <br />Classification <br />Hourly Rate <br />Project Manager <br />$157 <br />General Manager <br />$157 <br />Engineering Manager <br />$157 <br />Senior Engineer <br />$145 <br />Engineer <br />$134 <br />CAD Designer <br />$67 <br />Shop Fabrication <br />$62 <br />Clarifications - <br />1. Please note the fees shown above are for the first year of this contract, which must be <br />executed within 120 days of submission. Each additional year is subject to a yearly <br />increase of 3%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.