My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Water Control Panel Building Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 23 - Water Control Panel Building Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:04:19 PM
Creation date
8/16/2023 3:00:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 9 <br />REFERENCE <br />Kevin Coons, PE <br />Senior Professional Engineer <br />EngineeringAna IVtks, Inc. <br />(prey iouslywith H a rgis + As soc iates, <br />Inc.) <br />858.221,0264 <br />KCoons@enganalytics.com <br />PROGRAM MANAGER <br />Tony Rossi, PE <br />Engineering Manager <br />Hargis+Associate s, Inc. <br />858.410.7449 <br />trossi@hargis.com <br />DESIGN ENGINEER <br />Ross Horton, EIT <br />Staff Engineer <br />Ha rgis + Asso ci ate s, Inc. <br />858.373.7649 <br />RHorton@hargis.com <br />CONTRACTS <br />$182,134 total, Hargis + Associates <br />DATES <br />January 2014 — Present <br />EQUIPMENT AND <br />SOFTWARE <br />■ Wonderware HMI <br />• Ignition 5CADA <br />Raytheon Technologies Groundwater <br />Treatment Extraction System <br />Raytheon Technologies Corporation, Fullerton, California <br />t� <br />Trimax partnered with Hargis + Associates for three major groundwater extraction <br />and treatment upgrade projects at the farmer Hughes Aircraft Company Facility <br />in Fullerton, California. Trimax provided design services and manufactured a <br />verity of field control panels that cornmunlcate with groundwater extraction wells <br />and associated field instrumentation for pumping contaminated groundwater <br />from wells into various treatment systems that remove the contaminates before <br />returning clean water back into the ground for aquifer storage. <br />Groundwater Extraction and Treatment System Expansion <br />Trimax designed, fabricated, and tested the main PLC control panel to operate <br />and control a groundwater extraction and treatment (GET) system at the former <br />Hughes Aircraft Facility. The main PLC panel operates and provides status to <br />sub -panels, extraction well pumps, transfer pumps, and communicate with the <br />Trojan advanced oxidation process (AQP) system. Testing and start-up services <br />included operation of all pumps and motors, valves, filtration systems, UV -lighting <br />carbon absorption system, storage tank control and all extraction well controls. <br />Trimax tested all interlocks, shut -down and emergency systems to confirm <br />successful system operations. <br />■ Allen-Bradley PLCs The challenges of integrating multipliable ground -well pumps scattered <br />• Ethernet/Fiber ❑ptic throughout the Raytheon site and vicinity for this major environmental cleanup <br />included communicating control through fiber and wireless to the extraction <br />wells, integrating the water delivery systems, and manufacturing the water <br />treatment packages. <br />After a successful and on -schedule plant testing startup, and commissioning, <br />Trimax provided deliverables including Loop Diagrams and Control <br />Panel Drawings with PLC Control Code. We continue to provide ongoing <br />services for upgrades and rn odifica tion s to the plant controls. <br />TRIMAX I A TESCO CONTROLS COMPANY Water and Waste Water Project Qualifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.