My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Water Control Panel Building Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 23 - Water Control Panel Building Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:04:19 PM
Creation date
8/16/2023 3:00:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
23
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 12 <br />Robert W. Goldsworthy Desalter Expansion <br />and Completion of New Source Water Wells <br />and Conveyance Pipelines Project <br />Water Replenishment District of Southern California, Lakewood <br />This project expanded the existing 5 mgd Robert W. Goldsworthy Desalter <br />groundwater treatment facility to increase plant capacity and improve water <br />quality to comply with discharge regulations. To achieve this, an additional <br />reverse osmosis (RO) train was added to allow for increased filtration_ <br />TRIMAX was specifically responsible for upgrading the PLCs, implementing a <br />new Wonderware SCADA and upgrading the plant UL control panels. The system <br />upgrade consisted of 100+ instruments, CCTV equipment, servers, computers, <br />printer, Wonderware SCADA and associated other software. <br />The new system was designed with minimal downtime as possible. With this, <br />a redundant Schneider Electric Modicon M580 architecture was utilized to <br />maintain plant level equipment operation. On top of this sat a redundant <br />Wonderware System Platform SCADA for operators to interface, monitor and <br />trend plant systems. <br />To ensure accuracy and stability of the system, on -site loop testing and <br />calibration were completed. An additional on -sit Factory Acceptance Test, proved <br />out the control -loop functionality as outlined in the contract specification. <br />• Design and fabrication of ULcontrol panels using Modicon components <br />Programming of PLCs and SCADA software <br />• Field instrument calibration and control system commissioning <br />REFERENCE <br />Phuong Watson <br />Senior Engineer <br />562.275.4246 <br />pwatson@wrd.org <br />CO NTRACT <br />$1,535,584 <br />DATES <br />January 2016 —February 2019 <br />EQUIPMENT AND SOFTWARE <br />• Modicon M-580 <br />• Ethernet/Fiber Ring Communication <br />• Wonderware System Platform <br />SCADA <br />• Wonderware InTouch Panels <br />• Dream Reports <br />• Win-911 Dialer <br />TRIMAX I A TESCO CONTROLS COMPANY Water and Waste Water Project Qualifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.