projected schedule for completion. CEQA & NEPA processes have been completed and the City is in the final stage of the permitting process. 19. Please briefly describe the necessary construction/implementation for this project. The construction components include the following: 1. Rehabilitate Well. (chemical, mechanical, electrical). Currently well is in buried vault. Project would raise the well head to meet current Dept. of Public Health recommendations. (Well casing, tubes, etc. will need to be constructed to raise the well head to grade.) 2. Discharge piping. Construct approximately 3250 lineal feet of new pipeline to convey flows from Well 32 to Garthe Reservoir. 3. New Pumping Equipment (May included: pump and motor, piping, valves, disinfection, monitoring equipment. 4. Electrical Equipment Replacement (May include switchgear, control panel, Variable frequency drive, telemetry, lighting, programming, etc.) 5. Building Modifications. (May include concrete slab, masonry walls and foundation, sound attenuation.). 20. Please complete the schedule below for the project. Projects must be complete by March 31, 2026, to allow time for final invoice processing and retention payment before the State funds expire on June 30, 2026. Project administration should end at least three months after construction. <br /> <br /> <br /> Categories Start Date End Date (a) Project Administration 1/1/2021 8/1/2024 (b) Land Purchase / Easement NA NA (c) Planning/ Design / Engineering / Environmental Documentation 3/1/2021 1/31/2022 (d) Construction/ Implementation 4/1/2022 8/1/2024 <br />