My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Grovemont Street Water Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/16/2021 Regular
>
Item 14 - Grovemont Street Water Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:14:01 AM
Creation date
8/16/2023 5:19:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
11/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT A <br />PROPOSAL <br />PROJECT NO.: 21-6466 <br />GROVEMONT STREET WATER MAIN IMPROVEMENTS <br />BID PROPOSAL <br />TO; CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Stephen Doreck Equipment Rentals, Inc. <br />REQUIREMENT; <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby .proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sunn(s) set forth i the <br />following schedule <br />Item <br />Description <br />Qty Unit <br />Unit trice <br />Amount <br />1 <br />2 <br />E]4 <br />5 <br />Mobilization& Demobilization (Na <br />more than 5% of total bid) <br />12" DR 14 AWWA C900 P.V.0 <br />Water plain <br />8" Class 305 AWWA C900 l�.V.C. <br />Water il�lain <br />Construct 1" Water Service per City <br />$td, Plan 1401 <br />12" Gate Valve per City Std. Plan <br />1410 <br />40 LF <br />358o F <br />85 EA <br />1 EA <br />7 FA <br />�� g <br />�a�9 <br />$ <br />$ �+ <br />11 • QD <br />$ <br />�?190, 00 <br />$11150.. �Q <br />. <br />�3�W <br />$ � ."�C). <br />$� � O <br />SA <br />6 <br />8" Gate Valve per City Std, Plan <br />1410 . <br />7 <br />8 <br />4 <br />10 <br />Fire Hydrant Assembly per City <br />Std. Plan 1405 <br />Adjust Manhole Frame and Cover <br />to Finished Grade, <br />Adjust Water Valve Frame and <br />Coven to Finished Grade <br />1" Air Vacuum and Release Valve <br />per City Std. 1145 <br />1.2 FA <br />13 EA <br />& EA <br />I EA <br />1 a Ci'609"o <br />r <br />$ 9 J V, <br />$ <br />�� S-0. 00 <br />131,5M.00 <br />� 3�.�� <br />$ <br />05-0, <br />11 <br />12 <br />—. <br />13 <br />AsphaIt Rubber Hot Mix ARHM <br />AC Trench Pavement (T=6")* <br />Cold Mill (T=1.5")* <br />— 1350 TN <br />850 TN <br />143500 SF <br />$ <br />$ 1 601.004 <br />$ <br />P-1 of P-18 <br />E O <br />u <br />
The URL can be used to link to this page
Your browser does not support the video tag.