My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - SR-55/Ritchey Street Water Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/02/2021 Regular and Special
>
Item 13 - SR-55/Ritchey Street Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 10:45:54 AM
Creation date
8/17/2023 8:28:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
11/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-STE <br />Ralph Coil, CWI, NACE, ACI <br />Senior Inspector <br />Calleguas Municipal Water District <br />As fabrication inspector performed Quality Assurance inspection during fabrication of <br />large diameter steel pipe ranging in size from 8" to 49" diameter, PVC Pipe up to 48" <br />diameter and HDPE up to 54" diameter. Performed construction welding <br />inspection/NACE during the installation of steel pipe and fittings ranging in size from 8" <br />to 49" diameter. Duties include the verification of fit up and laying pipe in trench, a visual <br />weld inspection, witness NDE, coating inspections and is called upon to offer technical <br />assistance with difficult welding problems. <br />• Oxnard Plain Brine Line Pipeline Phase 113-54" HDPE/48"PVC <br />• Salinity Management Pipeline Phase 1E-49" Steel pipe <br />• Westlake Reservoir Replacement project <br />• Oak Park/North Ranch Recycled Pipe-18" HDPE Site <br />• SMP 213-32" HDPE <br />• SMP2D-12", 16", 20" HDPE <br />• Lake Sherwood Steel Reservoir-NACE <br />• SMP2A-30" Steel Pipe <br />California Department of Water Resources-Vall Cooper— <br />QA construction welding inspection and shop fabrication services of over 8 miles of 54" <br />to 85" diameter steel pipe and complex fittings. Duties include the verification of fit up <br />and laying pipe in trench, visual weld inspections, witness NDE, coating inspections and <br />called upon to offer technical assistance with difficult welding problems. Duties include <br />the verification of fit up and laying pipe in trench, visual weld inspections, witness NDE, <br />coating inspections. <br />• Mentone Pipeline - South & East, Foothill Pipeline to Crafton Hills Pump Station <br />San Diego County Water Authority- In -Plant Inspection and As Needed Services — <br />Senior fabrication/construction/NACE inspector during the fabrication of 54"-108" <br />diameter complex fittings cement lined and coated with specialty polyurethane lining <br />system. Duties include NACE certified coating inspection of field applied polyurethane <br />lining and epoxy coating systems, the verification of fit up, visual weld inspections, <br />witness NDE, coating inspections and were called upon to offer technical assistance with <br />difficult welding problems. Interprets drawings and plans, providing thorough and <br />accurate records of work performed, including crew make up, equipment make and <br />model, materials used, and enforced compliance with contract specifications. <br />Responsibilities included documentation of materials, equipment, personnel through <br />detailed daily reports. Provided technical support during application of High Solid Epoxy <br />Lining and Polyurethane paint systems. <br />• San Vicente Pump Station <br />• Pipeline 4 Paint Mountain to Del Dios Hwy Reline-11,000 Ft 93" Dia. Steel Liners <br />• 1-15 Reline Project-66", 69", 72" Dia. Steel liners <br />• Pipeline 4 Urgent Reline 1,100 ft of 68" Dia. <br />• Pipeline 4 Relining: SR52 to Lake Murray-17,OOOft 66"-69" Dia. Steel Liners <br />• Pipeline 3 Relining: Sweetwater to Lower Otay-32,OOOft 66"-69" Dia. Steel Liners <br />• Pipeline 3 Desal Relining -San Marcos to Twin Oak-28,OOOft 67"-69" Dia. Steel Liners <br />• Mission Trails Tunnel- 5000 ft 96" Dia. Pipe Fittings <br />• Pipeline 3 SR52 to lake Murray Relinine-17,OOOft 66"-69" Dia. Steel Liners <br />• Pipeline 4 Reline Del Dios to Black Mountain Ranch-26,000 ft 93" Dia. Steel Liners <br />• Pipeline 5 Relining: to Sage Rd-14,OOOft 96" Dia. Steel Liners <br />• San Vicente Dam Raise-60"-108" Dia. Fittings and Engineered Equipment <br />• Carlsbad Desalinization Project-50,OOOft 54" Dia. Pipe, Valves <br />• Twin Oaks Valley Water Treatment Plant-60" to 93" Dia. Pipe Fittings <br />• Moreno Lakeside Project-72" Dia. Pipe Fittings <br />
The URL can be used to link to this page
Your browser does not support the video tag.