Laserfiche WebLink
ON-STE <br />Vance Sanford, CWI, NACE <br />Senior Inspector <br />San Diego County Water Authority- In -Plant Inspection and As Needed Services — <br />Senior fabrication/construction/NACE inspector during the fabrication of 54"-108" <br />diameter complex fittings cement lined and coated with specialty polyurethane lining <br />system. Duties include NACE certified coating inspection of field applied polyurethane <br />lining and epoxy coating systems, the verification of fit up, visual weld inspections, <br />witness NDE, coating inspections and were called upon to offer technical assistance with <br />difficult welding problems. Interprets drawings and plans, providing thorough and <br />accurate records of work performed, including crew make up, equipment make and <br />model, materials used, and enforced compliance with contract specifications. <br />Responsibilities included documentation of materials, equipment, personnel through <br />detailed daily reports. Provided technical support during application of High Solid Epoxy <br />Lining and Polyurethane paint systems. <br />• Pipeline 4 Paint Mountain to Del Dios Hwy Reline-11,000 Ft 93" Dia. Steel Liners <br />• 1-15 Reline Project-66", 69", 72" Dia. Steel liners <br />• Pipeline 4 Urgent Reline 1,100 ft of 68" Dia. <br />• Pipeline 4 Relining: SR52 to Lake Murray-17,OOOft 66"-69" Dia. Steel Liners <br />• Pipeline 3 Relining: Sweetwater to Lower Otay-32,OOOft 66"-69" Dia. Steel Liners <br />• Pipeline 3 Desal Relining -San Marcos to Twin Oak-28,OOOft 67"-69" Dia. Steel Liners <br />• Mission Trails Tunnel- 5000 ft 96" Dia. Pipe Fittings <br />• Pipeline 3 SR52 to lake Murray Relinine-17,OOOft 66"-69" Dia. Steel Liners <br />• Pipeline 4 Reline Del Dios to Black Mountain Ranch-26,000 ft 93" Dia. Steel Liners <br />• Pipeline 5 Relining: to Sage Rd-14,OOOft 96" Dia. Steel Liners <br />• San Vicente Dam Raise-60"-108" Dia. Fittings and Engineered Equipment <br />• Carlsbad Desalinization Project-50,OOOft 54" Dia. Pipe, Valves <br />