My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Affordable Housing Project at 801, 807, 809 and 809 ½ E. Santa Ana Blvd
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 16 - Affordable Housing Project at 801, 807, 809 and 809 ½ E. Santa Ana Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 11:55:22 AM
Creation date
8/17/2023 11:53:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br />ESTIMATED CONSTRUCTION COSTS <br />FRANCIS XAVIER RESIDENCE <br />SANTA ANA, CALIFORNIA <br />I.Direct Costs 1 <br />Site Improvements 15,000 Sf Land $25 /Sf Land $375,000 <br />Residential Building Costs 14,321 Sf GBA $220 /Sf GBA 3,151,000 <br />Furnishings, Fixtures & Equipment 50,000 <br />Contractor Fees / General Requirements 12.0%Construction Costs 423,000 <br />General Liability Insurance / Const Bonds 2.0%Construction Costs 71,000 <br />Contingency Allowance 20.0%Other Direct Costs 814,000 <br />Total Direct Costs 14,321 Sf GBA $341 /Sf GBA $4,884,000 <br />II.Indirect Costs <br />Architecture, Engineering & Consulting 7.0%Direct Costs $342,000 <br />Permits & Fees 2 17 Units $31,353 /Unit 533,000 <br />Taxes, Ins., Legal & Accounting 3.0%Direct Costs 147,000 <br />Marketing & Leasing 17 Units $882 /Unit 15,000 <br />Developer Fee 3 7%Net Construction Costs 442,000 <br />Contingency Allowance 10.0%Other Indirects 148,000 <br />Total Indirect Costs $1,627,000 <br />III.Financing Costs <br />Interest During Construction 4 $3,493,000 Loan Amount 5.05%Interest $235,000 <br />Financing Fees <br />Construction Loan $3,493,000 Loan Amount 1.00 Point 35,000 <br />Capitalized Reserves <br />Operating Reserve 4 Months Operating Expenses & Debt Svc Pmts 60,000 <br />NPLH Transition Reserve 5 57,000 <br />Total Financing Costs $387,000 <br />IV.Total Development Costs 17 Units $405,800 /Unit $6,898,000 <br />1 Estimates assume prevailing wage requirements will not be imposed on the Project. <br />2 Based on Developer estimate. The estimate should be verified by City staff. <br />3 Per Developer. Net construction costs equate to the total construction costs less the developer fee. <br />4 <br />5 Based on Developer estimate. <br />Based on a 20-month construction period with a 60% average outstanding balance; and a 4-month absorption period with a 100% average outstanding <br />balance. <br />Prepared by: Keyser Marston Associates, Inc. <br />Filename: Francis Xavier Residence PF_8 27 21.xlsm; Pro Forma_w 3 PBV; trb 1 of 12 <br />EXHIBIT 3
The URL can be used to link to this page
Your browser does not support the video tag.