Laserfiche WebLink
City of Santa Ana Page 2 of 3 <br />Flower St. Sewer Main Improvements (18-6616), bidding on 09/09/2021 2:00 PM (PDT) Printed 09/21/2021 <br />Line Items <br />Discount Terms No Discount <br />Item Item Type <br />Item Description <br />UOM <br />QTY <br />Unit Price <br />Line Total <br />Response Comment <br /># Code <br />Section 1 <br />$3,581,155.00 <br />1 <br />Mobilization/Demobilization (No morethan 5%total bid) <br />LS <br />1 <br />S150,000.00 <br />$150,000.00 <br />Yes <br />2 <br />Prepare and Implement Traffic Control Plan <br />LS <br />1 <br />5150,000.00 <br />$150,000.00 <br />Yes <br />3 <br />Stormwater Best Management Practices (BMP) <br />LS <br />1 <br />515,000.00 <br />$15,000.00 <br />Yes <br />4 <br />Furnish Temporary Sewer By-pass Pumping System <br />LS <br />1 <br />$125,000.00 <br />$125,000.00 <br />Yes <br />5 <br />Remove and Dispose Existing 8" VCP Sewer Pipe <br />LF <br />707 <br />$40.00 <br />$28,280.00 <br />Yes <br />6 <br />Remove and Dispose Existing 10" VCP Sewer Pipe <br />LF <br />508 <br />$50.00 <br />$25,400.00 <br />Yes <br />7 <br />Remove and Dispose Existing 12" VCP Sewer Pipe <br />LF <br />1665 <br />$50.00 <br />$83,250.00 <br />Yes <br />8 <br />Construct 8" PVC (SDR 26) Sewer Pipe <br />LF <br />127 <br />$375.00 <br />$47,625.00 <br />Yes <br />9 <br />Construct 10" PVC (SDR 26) Sewer Pipe <br />LF <br />15 <br />$390.00 <br />$5,850.00 <br />Yes <br />10 <br />Construct 12" PVC (SDR 26) Sewer Pipe <br />LF <br />692 <br />$405.00 <br />$280,260.00 <br />Yes <br />11 <br />Construct 15" PVC (SDR 26) Sewer Pipe <br />LF <br />2361 <br />$440.00 <br />$1,038,840.00 <br />Yes <br />12 <br />Construct New 48" Precast Concrete Eccentric Cone Manhole Per City Std. Plan No. 1201 ADFASDF <br />EA <br />11 <br />$7,000.00 <br />$77,000.00 <br />Yes <br />13 <br />Construct New P.C.C. Drop Sewer Manhole Per City Std. Plan 1201A <br />EA <br />1 <br />$8,500.00 <br />$8,500.00 <br />Yes <br />14 <br />NOTUSED <br />_ <br />0 <br />$0.00 <br />$0.00 <br />Yes <br />15 <br />Pressure Wash And Protect Existing Manhole In Place. Clean Existing Manhole And Coat Manhole Interior With 125 MIL. <br />EA <br />3 <br />$4,000.00 <br />$12,000.00 <br />Yes <br />Epoxy/Polyurethane Lining System Including The Base <br />16 <br />Reconnect All Existing Live Sewer Main To New Manhole <br />EA <br />5 <br />$3,000.00 <br />$15,000.00 <br />Yes <br />17 <br />Protect Existing Sewer In Place <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />Yes <br />is <br />Abandon Existing Sewer Main In Place <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />Yes <br />19 <br />Remove and Dispose of Existing Sewer Manhole <br />EA <br />11 <br />$2,500.00 <br />$27,500.00 <br />Yes <br />20 <br />Remove And Replace Like -For -Like Existing Improvements Including But Not Limited To Curb And Gutter, PCC Side Walk, Grass And <br />LS <br />1 <br />$80,000.00 <br />$80,000.00 <br />Yes <br />Other Landscaping <br />21 <br />Abandon Existing Manhole, Remove The Top 18", Break Base Per Std. Plan No. 1209 And Fill The Manhole Barrel With 1 Sack Slurry, <br />EA <br />2 <br />$2,500.00 <br />$5,000.00 <br />Yes <br />Back Fill To The Natural Ground, Match Existing Finish Surface Salvage Manhole Cover And Frame TOThe City <br />22 <br />Construct New Sewer Lateral To Back To Right Of Way Connect To Existing 4" VCP Lateral With Eccentric Reducer Couplings Per City <br />EA <br />81 <br />$4,000.00 <br />$324,000.00 <br />Yes <br />Std. Plan No. 1204 <br />23 <br />Construct Sewer Pipe Casing Per City Std. Plan No. 1203. Replace Existing Median, Irrigation System, And Tree As Necessary <br />LF <br />70 <br />$350.00 <br />$24,500.00 <br />Yes <br />24 <br />Clearing and Grubbing <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />Yes <br />25 <br />Cold Mill Existing Pavement <br />SF <br />154000 <br />$0.30 <br />$46,200.00 <br />Yes <br />26 <br />Remove Existing and construct AC Dig Out <br />SF <br />400 <br />$12.00 <br />$4,800.00 <br />Yes <br />27 <br />Construct 2" Asphalt Rubber Hot Mix (ARHM) <br />TON <br />1900 <br />$115.00 <br />$218,500.00 <br />Yes <br />28 <br />Sawcut, Remove and Construct PCC Pavement <br />SF <br />24500 <br />$18.00 <br />$441,000.00 <br />Yes <br />29 <br />Sawcut, Remove and Construct Curb Ramp <br />EA <br />2 <br />$8,500.00 <br />$17,000.00 <br />Yes <br />30 <br />Sawcut, Remove and Construct Sidewalk <br />SF <br />2000 <br />$14.00 <br />$28,000.00 <br />Yes <br />31 <br />Sawcut & Remove and construct Curb and Gutter <br />LF <br />100 <br />$100.00 <br />$10,000.00 <br />Yes <br />32 <br />Remove Existing and construct 6" Median Curb, including 4" thick Fill in Concrete <br />LS <br />1 <br />$37,000.00 <br />$37,000.00 <br />Yes <br />33 <br />Adjust to Grade Sewer Manhole <br />EA <br />8 <br />$750.00 <br />$6,000.00 <br />Yes <br />34 <br />Adjust to Grade Water Valve <br />EA <br />22 <br />$450.00 <br />$9,900.00 <br />Yes <br />35 <br />Adjust to Grade Storm Drain Manhole <br />EA <br />1 <br />$750.00 <br />$750.00 <br />Yes <br />36 <br />Install Traffic Signal Loops <br />EA <br />36 <br />$750.00 <br />$27,000.00 <br />Yes <br />37 <br />Signing, Striping, Markings & Pavement Legends <br />LS <br />1 <br />518,000.00 <br />$18,000.00 <br />Yes <br />38 <br />Create Planting & Irrigation Plan for Median at Station 46+50 to 48+75 <br />LS <br />1 <br />$23,000.00 <br />$23,000.00 <br />Yes <br />39 <br />Planting Work for Median at Station 46+50 to 48+75 <br />LS <br />1 <br />$30,000.00 <br />$30,000.00 <br />Yes <br />40 <br />Re -Establish 1" Irrigation Water Service for Median at Station 46+50 to 48+75 <br />LS <br />1 <br />$25,000.00 <br />$25,000.00 <br />Yes <br />41 <br />Construction Permit <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />Yes <br />42 <br />Import Backfill Material and Dispose Native Soil* <br />CY <br />800 <br />$45.00 <br />$36,000.00 <br />Yes <br />43 <br />Sewer Flow Level Monitoring & Alarming Device <br />EA <br />2 <br />$5,000.00 <br />$10,000.00 <br />Yes <br />44 <br />Sawcut, Remove and Construct PCC Bus Pad Per City Std. Plan No. 1108 <br />SF <br />200 <br />$25.00 <br />$5,000.00 <br />Yes <br />PlanetBids, Inc. <br />