Laserfiche WebLink
2 Restoration and Clean U . At its sole cost, Licensee shall, after use of the License <br />Area, restore the License Area to an acceptable condition, as determined by the City, leave the <br />License Area in a neat and clean condition to the sole satisfaction of the City, free of trash and debris, <br />and remove all property and materials of Licensee. Licensee shall cause the License Area to be <br />cleaned, with such work to be completed no later than the times specified in the License as stated <br />in paragraph 1 above, and the License shall be extended to such time for the limited purpose of allowing <br />the cleaning work to be completed. <br />3. Compliance with Laws. Licensee shall cause all activities of Licensee under this <br />Agreement and all activities on the License Area to be performed in compliance with all applicable <br />federal, state, and local laws, ordinances, and regulations, and permits. <br />4. Maintenance. <br />a. Licensee shall include, implement, and maintain but not be limited to the following Best <br />Management Practices (BMPs) at the License Area: <br />i. Waste management and Materials Pollution Control BMPs shall be implemented <br />to prevent the contamination of stormwater by construction wastes and materials. <br />ii. Tracking control (TC) BMPs to control off -site sediment tracking shall be <br />implemented and maintained. <br />iii. Sediment control (SE) BMPs shall be implemented at all locations along the site <br />perimeter, at all operational storm drain inlets and at all non -active slopes, as <br />appropriate. <br />iv. Pollution prevention practices shall be implemented. <br />V. Non-stonmwater management measures to prevent illicit discharges and control <br />stormwater pollution sources. <br />vi. Erosion Control 13MPs shall be implemented, as appropriate. <br />vii. Wind erosion control BMPs (dust control) shall be implemented, as appropriate. <br />viii. Nan-stormwater BMPs shall be implemented to reduce or prevent the <br />contamination of stormwater from construction activities. <br />For specific guidance reference, reference the Construction Runoff Guidance Manual <br />(Orange County Stormwater Program, December 2012) <br />Fhttps://media.ocgov.com/,eov/w/watersheds/documents/bm /constructionactivities.as ] or the <br />California Stormwater Quality Association (CASQA) Stormwater BMP Handbook for <br />Construction. <br />b. Licensee's, at its sole cost and expense, shall: <br />i. Install and maintain an eight (8) foot high security 4D fence or comparable fence <br />to provide security around the front perimeter of the License Area facing East <br />Alton Avenue, and the rear perimeter of the License Area parallel to Highway 55. <br />Fence shaII secure the Property and serve as a visibility blocker for the License <br />Area. Fencing shall mirror current fencing and remain after the termination of the <br />Agreement for City use; <br />ii. Grade/level the lot as flat as possible and add base rock in order to minimize dirt <br />track out. No dirt shall be removed from the License area during the <br />Page 2 of 6 <br />