CUSTOMER NAME SANTA ANA, CITY OF
<br />Customer Number: 3‐000‐0071‐30
<br />Lamp Wattage Lamp Count
<br />Estimated
<br />High Pressure
<br />Sodium Vapor
<br />(HPSV)
<br />Annual Costs
<br />Estimated
<br />Light Emitting Diode
<br />(LED)
<br />Annual Costs
<br />Estimated Annual
<br />Savings
<br />50 Watt 33 $4,819 $4,574 $246
<br />70 Watt 137 $22,342 $19,991 $2,351
<br />100 Watt 2,383 $442,666 $359,452 $83,214
<br />150 Watt 210 $50,702 $38,203 $12,499
<br />200 Watt 871 $244,577 $170,681 $73,896
<br />250 Watt 24 $7,834 $5,754 $2,079
<br />310 Watt 0 $0 $0 $0
<br />400 Watt 32 $14,100 $9,043 $5,057
<br />Total 3,690 $787,041 $607,698 $179,342
<br />This analysis is only a 12 month estimate and the results presented are based on HPSV Lamp Wattage and counts
<br />above as of January 2021, LED wattage conversion lamps available at this time, and February 1, 2021 rates. This
<br />analysis excludes the following when applicable: Tap Device Charge, State Tax, Utility Users Tax, and Generation
<br />Municipal Surcharge. The analysis does not include costs associated with Incandescent, Mercury Vapor, Low Pressure
<br />Sodium Vapor, Metal Halide, or already existing LED Lamps. Actual costs may vary due to factors including but not
<br />limited to, rate changes, factor changes, wattage conversion changes, excluded cost components.
<br />CONFIDENTIAL AND/OR PROPRIETARY INFORMATION OF SOUTHERN CALIFORNIA EDISON
<br />AND/OR ITS CUSTOMERS OR VENDORS. PUBLIC DISCLOSURE IS RESTRICTED.
<br />This analysis is provided to help you evaluate your current Southern California Edison (SCE) bill and/or compare your projected bills to other SCE
<br />rate options. These results are based on your past usage and/or assumptions about your energy usage and cannot be guaranteed bySCE. This rate
<br />analysis may not reflect all of the rate options that are available to you as an SCE customer. Your actual bills will vary from this analysis due to
<br />changes to your actual usage and assumptions such as operating hours, the equipment you use, kVAR charges, weather patterns, service voltage,
<br />firm service levels, taxes, and added facilities charges. Moreover, the rate options used in this analysis are subject to change by the California
<br />Public Utilities Commission (CPUC), which would also alter the outcome of this analysis.
<br />If your current rate schedule becomes unavailable — either by action of the CPUC or because you are no longer eligible to be placed on the rate —
<br />you will be notified of your rate options. If you do not select a different applicable rate option at that time, you will be placed on a default rate
<br />SCE, Confidential HPSV Template_02.01.21.xlsx 4/29/2021
|