My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Grant Application for Solar Power Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 26 - Grant Application for Solar Power Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:46:28 AM
Creation date
8/17/2023 11:57:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Job No. 2669.01 Water Systems Alternative Energy Feasibility Study <br />SECTION 4: <br />HISTORICAL WATER DELIVERY <br />Per the 2017 Master Water Plan, the City of Santa Ana delivers an average potable water flow of 33.5 MGD, with <br />a maximum daily flow of 45.2 MGD. This total water use is about 12 billion gallons per year, with a peak flow <br />rate of 45,000 gallons per minute (gpm) and an average flow rate of 23,000 gpm. <br />The projection for growth in the Master Plan is fairly moderate, with an anticipated Near -Term average daily <br />load rising to 34.9 MGD, and the full buildout (2040) average load rising to 35.5 MGD, 6% higher than today's <br />load. This analysis will not evaluate the potential effects of increasing loads in the future, because the growth <br />rate is expected to be quite low. <br />CITY OF SANTA ANA <br />Newcomb I Anderson I McCormick <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.